The construction of the railway overbridge at Harouni crossing on the Harouni-Jaitipur section in Lucknow has been completed ahead of schedule. After completing all technical and safety checks, the bridge is now open for vehicles. This development provides significant relief to over 5 lakh people who faced daily traffic struggles.
ℹ️: JET 2026: Special trains announced from Ranchi for candidates returning after exam।
What are the key details of the Harouni Overbridge?
The project was executed by the Setu Nigam with funding and monitoring from the PWD. The bridge is 589.30 meters long and 7.50 meters wide, featuring two lanes. To ensure smooth movement, service roads of 3.75 meters width have been built on both sides. The total cost of this project was ₹43.19 crore.
How will this bridge help local commuters?
Previously, the Harouni railway crossing closed more than 50 times a day, causing massive traffic jams. Commuters had to travel an extra six kilometers to bypass the crossing. Now, the bridge directly connects Mohan and Kanpur Road, making travel faster toward Hasanganj, Hardoi, and Sitapur Road.
| Feature | Detail |
|---|---|
| Total Cost | ₹43.19 Crore |
| Length | 589.30 Meters |
| Width | 7.50 Meters (2 Lane) |
| Beneficiaries | 5 Lakh+ People |
| Connectivity | Mohan to Kanpur Road |
























