Achalda Railway Crossing Closure: Express Trains Delayed

Commuters and passengers faced significant chaos as the Achalda railway crossing closure lasted for an hour and a half, causing massive traffic jams and disrupting train schedules on the vital Delhi-Howrah rail route.
Express Trains Detained
The extended closure of the 13-B railway crossing led to immediate operational hurdles. Two express trains were forced to halt on the outer tracks for approximately 15 minutes due to the obstruction, ensuring safety while the crossing was managed.
A History of Operational Challenges
The 13-B railway crossing in Achalda has become a recurring point of logistical concern for the railways. Recent records highlight a pattern of disruptions at this specific location:
- September 21, 2026: A 23-minute closure occurred due to heavy train traffic.
- September 15–17, 2026: The area underwent three days of scheduled repairs.
- February 10, 2024: A technical malfunction involving a gate boom jam necessitated stopping trains on outer lines to prevent accidents.
Safety Mandates and Legal Warnings
Under current Indian Railways regulations, station masters and gatemen are strictly required to manage non-interlocked level crossings. This includes ensuring gates remain closed to road traffic during all train movements to prevent accidents.
To address these recurring safety issues, the Railway Board recently issued a directive on September 18, 2026, to all General Managers. The mandate emphasizes the mandatory installation of lifting barriers to enhance safety at these crossings.
Authorities continue to warn the public that bypassing closed railway gates is a serious legal offense. Under the Indian Railways Act, those attempting to cross illegally face fines and potential imprisonment.