Ahmedabad Bullet Train Station: 3 New Platforms for Vande Bharat!

Indian Railways completes platforms 10, 11, and 12 beneath the Ahmedabad Bullet Train station to boost Vande Bharat and Express train services.

Kush Singh16 November 20262 min read0 viewsBullet Train
Ahmedabad Bullet Train Station: 3 New Platforms for Vande Bharat!

The Ahmedabad railway station is undergoing a massive transformation. Indian Railways has successfully completed the construction of three new platforms—numbered 10, 11, and 12—located directly beneath the under-construction Ahmedabad bullet train station.

Boosting Capacity for Vande Bharat and Express Trains

To support this expansion, three new Broad Gauge lines have been constructed, designated as lines 16, 17, and 18. These lines are specifically designed to facilitate the smooth operation of Vande Bharat, various Express trains, and essential local passenger services.

HelloRail की हर खबर सबसे पहलेJoin Channel

This infrastructure milestone is a key step in integrating traditional rail services with the high-speed network currently being developed by the National High Speed Rail Corporation Limited (NHSRCL).

Safety Clearances and Integrated Transit

The Commissioner of Railway Safety (CRS) has already conducted a formal safety inspection of these new lines. Once the final safety clearances are received and all necessary operational protocols are fulfilled, Indian Railways expects to initiate full passenger services at these platforms.

The site is being transformed into a massive integrated transit hub, allowing passengers to move seamlessly between:

  • Traditional Indian Railways services
  • The Metro network
  • The upcoming High-Speed Rail network

This development marks a major change for the area, as Platform 10 had been closed since July 2022 to accommodate the ongoing construction work.

Minister V. Somanna Reviews Progress

On Sunday, November 15, 2026, Union Minister of State for Railways V. Somanna visited the site to review the construction progress. During his visit, he oversaw the arrangements being made to ensure seamless passenger transfers between the different modes of transport.

Wider Infrastructure Upgrades in the Region

The enhancements at Ahmedabad are part of a broader strategic effort to modernize regional connectivity and increase capacity. Other ongoing projects include:

  • The construction of a fifth railway line between the Ahmedabad station and the Kankaria depot.
  • A new Broad Gauge bypass known as Y-connectivity, located between Asarva and the Sabarmati 'A' Cabin.

The Road to 2029

While the Ahmedabad station upgrades are moving forward, the full Mumbai-Ahmedabad High-Speed Rail corridor is currently scheduled for complete realization by 2029.

In a related operational update, NHSRCL is also preparing to energize the overhead equipment for the Surat-Bilimora section with 25,000 volts starting November 20.

Share:

Comments

Leave a comment