Ahmedabad Railway Station: India’s first 16-storey multi-modal hub to be ready by 2027

Kush Singh1 July 20262 min read0 viewsBullet Train
Ahmedabad Railway Station: India’s first 16-storey multi-modal hub to be ready by 2027

Ahmedabad is getting a massive makeover with the construction of India’s first 16-storey multi-modal railway station at Kalupur. This project aims to integrate bullet trains, metro, buses, and traditional trains under one roof. The development is expected to be completed by July 2027, with some estimates suggesting the end of 2027.

📰: UP TET 2026: Indian Railways to run exam special trains, check routes and timings

What are the key features of the new station?

HelloRail की हर खबर सबसे पहलेJoin Channel

The station is being built over platforms 10, 11, and 12 of the existing Ahmedabad station and will connect directly to the Kalupur Metro station. With a project cost of approximately 24,000 crore rupees, it will feature a design inspired by the local culture of Ahmedabad. The building will include a four-star hotel, retail shops, a mall, and modern lounges for passengers.

Facility Details
Parking 6 floors for 3,000 cars
Vertical Transport 30 Lifts, 6 Escalators, 25 Stairs
Green Energy Rooftop solar panels and EV charging stations
Capacity Designed for 2-3 lakh passengers
Security CCTV surveillance throughout

What is the current progress of the project?

Western Railway DRM Ved Prakash stated that 15 floors of the 16-storey building are already complete. The pillars for the two underground levels and the top two floors are also ready. Additionally, the elevated roads leading to the station have been constructed. This hub will be a central point for the 508 km Mumbai-Ahmedabad High-Speed Rail corridor developed with Japanese cooperation.

Frequently Asked Questions (FAQs)

अहमदाबाद का नया रेलवे स्टेशन कब तक बनकर तैयार होगा?

यह प्रोजेक्ट जुलाई 2027 तक पूरा होने की उम्मीद है, हालांकि कुछ रिपोर्ट के अनुसार यह 2027 के अंत तक तैयार हो सकता है।

इस स्टेशन की सबसे खास बात क्या है?

यह भारत का पहला 16 मंजिला मल्टी-मॉडल हब होगा जहाँ बुलेट ट्रेन, मेट्रो, बस और सामान्य ट्रेनें एक ही जगह मिलेंगी।

Share:

Comments

Leave a comment