₹64.54 Cr Overbridge Approved to End Baghpat Traffic Woes

A new ₹64.54 crore railway overbridge on the Baraut-Aminagar Sarai route will end traffic congestion in Baghpat.

Kush Singh27 November 20261 min read0 viewsDevelopment
₹64.54 Cr Overbridge Approved to End Baghpat Traffic Woes

The Baghpat railway overbridge project has received a major boost as the government has officially granted administrative and financial approval for its construction. Located on the Baraut-Aminagar Sarai route, this vital infrastructure project is set to transform travel for thousands of commuters in the region.

Solving the Long-Standing Traffic Crisis

For a long time, residents and travelers on the Baraut-Aminagar Sarai route have faced significant delays. The existing railway crossing has frequently become a bottleneck, leading to massive traffic jams that disrupt the flow of vehicles and waste precious time for locals.

HelloRail की हर खबर सबसे पहलेJoin Channel

The proposed railway overbridge aims to provide a seamless passage, ensuring that both rail and road traffic can move without constant interruption. This infrastructure upgrade is expected to be a game-changer for local connectivity, finally addressing a long-standing grievance of the community.

Project Cost and Financial Breakdown

The scale of this project is substantial, with the total estimated cost pegged at ₹64.54 crore. To ensure that work begins without delay, the government has already taken the first step by releasing the initial funds.

  • Total Project Cost: ₹64.54 crore
  • First Installment Released: ₹13.3 crore
  • Primary Route: Baraut-Aminagar Sarai

With the first installment of ₹13.3 crore already allocated, the project is poised to move into its active construction phase, bringing the vision of a congestion-free route closer to reality for the people of Baghpat.

Share:

Comments

Leave a comment