₹64.54 Cr Overbridge Approved to End Baghpat Traffic Woes
A new ₹64.54 crore railway overbridge on the Baraut-Aminagar Sarai route will end traffic congestion in Baghpat.

The Baghpat railway overbridge project has received a major boost as the government has officially granted administrative and financial approval for its construction. Located on the Baraut-Aminagar Sarai route, this vital infrastructure project is set to transform travel for thousands of commuters in the region.
Solving the Long-Standing Traffic Crisis
For a long time, residents and travelers on the Baraut-Aminagar Sarai route have faced significant delays. The existing railway crossing has frequently become a bottleneck, leading to massive traffic jams that disrupt the flow of vehicles and waste precious time for locals.
The proposed railway overbridge aims to provide a seamless passage, ensuring that both rail and road traffic can move without constant interruption. This infrastructure upgrade is expected to be a game-changer for local connectivity, finally addressing a long-standing grievance of the community.
Project Cost and Financial Breakdown
The scale of this project is substantial, with the total estimated cost pegged at ₹64.54 crore. To ensure that work begins without delay, the government has already taken the first step by releasing the initial funds.
- Total Project Cost: ₹64.54 crore
- First Installment Released: ₹13.3 crore
- Primary Route: Baraut-Aminagar Sarai
With the first installment of ₹13.3 crore already allocated, the project is poised to move into its active construction phase, bringing the vision of a congestion-free route closer to reality for the people of Baghpat.