Bhagalpur Rail Safety: AI CCTV Cameras at 18 Level Crossings
Malda Division is installing solar-powered AI CCTV cameras at 18 non-interlocked level crossings in Bhagalpur to boost rail safety.

The Malda Division is launching a major safety upgrade for the Bhagalpur rail section. A new project, valued at approximately ₹1 crore 96 lakh 45 thousand, has been initiated to install high-tech CCTV cameras at 18 non-interlocked level crossings.
Currently, the Bhagalpur section accounts for the vast majority of the division's safety concerns, containing 18 of the Malda Division's 22 total non-interlocked gates. This project aims to mitigate the significant risks associated with crossings that are not yet linked to the signaling interlocking system.
AI-Powered Surveillance and Real-Time Monitoring
The new surveillance infrastructure will be solar-powered, ensuring reliable operation. These cameras will provide live video feeds directly to the nearest Station Master and the engineering control room, allowing for constant, real-time monitoring of gate activity.
A key feature of this technology is the inclusion of AI-based alerting systems. These smart features are designed to automatically notify railway officials if a gate remains open or fails to close within the designated timeframe. This technological leap is expected to enhance the accountability of gatemen and strengthen existing protocols, including the private number system, voice loggers, and station master authorization processes.
A Response to National Safety Mandates
The installation of these AI-driven systems follows a nationwide mandate from the Railway Board. This directive was issued after a tragic accident on July 8, 2025, in the Cuddalore district of Tamil Nadu, where a train collided with a school van at a manned crossing. In response, Zonal Railway General Managers have been instructed to ensure that these AI systems maintain strict accuracy thresholds when detecting the status of level crossing gates.
Long-Term Infrastructure and Safety Measures
While the CCTV installation serves as an immediate safety enhancement, the Indian Railways is pursuing broader, long-term solutions to eliminate the risks posed by non-interlocked gates:
- System Interlocking: The railway is continuously working on converting non-interlocked gates into fully interlocked systems.
- CROE (Fencing) Projects: Fencing work to prevent cattle-related accidents has already been completed along the Malda-Bhagalpur-Jamalpur rail section. Similar fencing projects are planned for the Bhagalpur-Banka and Dumka rail lines.
- Commuter Safety: To provide permanent safety for commuters, the railway intends to construct underpasses at these crossing locations.