Bhagwanpur-Samastipur Rail Line: Survey Approved for New 49km Route
The Railway Board has approved the survey for the 49km Bhagwanpur-Samastipur rail line, a ₹1,692 crore project to boost Bihar's connectivity.

The Railway Board has officially greenlit the Final Location Survey (FLS) for a transformative 49-kilometer rail line connecting Bhagwanpur to Samastipur. This new route, which will pass through Mahuwa and Tajpur, is set to revolutionize regional connectivity in Bihar.
To kickstart this massive undertaking, the board has sanctioned ₹1.47 crore for the survey process. Once fully implemented, the project, falling under the jurisdiction of the East Central Railway (ECR) and the Samastipur Railway Division, is estimated to cost approximately ₹1,692 crore.
Slashing Travel Distance via Hajipur
One of the most significant advantages of the proposed Bhagwanpur Samastipur rail line is the drastic reduction in travel distance. Currently, commuters traveling from Hajipur to Samastipur must take a route via Muzaffarpur, covering roughly 105 kilometers.
The new line will cut this distance down to just 57 kilometers, providing a much faster and more efficient connection for passengers and freight alike. This project is part of a larger vision to expand Bihar's railway network, which includes 29 new rail line projects across the state.
New Stations and Advanced Infrastructure
The project is not just about tracks; it involves a complete overhaul of regional transit infrastructure. The planned route will see the development of several new stations, including:
- Mahuwa Jalalpur
- Mukandpur
- Sultanpur Haq
- Harihar
Additionally, existing stations at Bhagwanpur and Karpurigram will undergo significant upgrades to handle the increased traffic.
On the engineering front, the project is designed for modern, uninterrupted transit. The specifications include:
- Construction of 7 major bridges.
- Approximately 51 underpasses.
- The elimination of traditional railway level crossings to ensure safety and speed.
- A Road Overbridge (ROB) near the Tajpur vegetable market to improve traffic flow across National Highway 28.
A Catalyst for Trade and Employment
This initiative has gained significant political momentum, with local leaders championing its potential to boost the regional economy. The project is expected to be a major driver for agriculture, trade, and employment in the area.
Union Minister Chirag Paswan, whose parliamentary constituency the line passes through, and Bihar PHED Minister Sanjay Singh have both emphasized the project's importance. They noted that the new line will be a game-changer for the local vegetable trade and overall economic growth in the region.