Bhagwanpur-Samastipur Rail Line: Survey Approved for 49km Route
The Railway Board has approved the survey for the 49km Bhagwanpur-Samastipur rail line, set to drastically reduce travel distance in Bihar.

The Railway Board has officially greenlit the Final Location Survey (FLS) for the proposed Bhagwanpur Samastipur rail line. This new 49-kilometer track, which will pass through Mahua and Tajpur, is set to transform regional connectivity in Bihar.
To facilitate this essential phase of the project, authorities have sanctioned a budget of ₹1.47 crore. The initiative falls under the jurisdiction of the East Central Railway (ECR) and will be managed by the Samastipur Railway Division. While the survey is currently underway, the total estimated cost for the entire project is approximately ₹1,692 crore.
A Massive Shortcut for Commuters
One of the most significant benefits of this new line is the drastic reduction in travel distance. Currently, the rail journey between Hajipur and Samastipur covers approximately 105 kilometers. Once this new 49km route is operational, the distance will be slashed to roughly 57 kilometers, saving commuters a substantial amount of time.
Advanced Engineering and Infrastructure
The engineering plan for this route is designed to ensure smooth and uninterrupted transit. Key features of the project include:
- Construction of seven major bridges.
- Creation of approximately 51 underpasses.
- A design that avoids traditional level crossings to enhance safety.
- A dedicated Road Overbridge (ROB) near the Tajpur vegetable market to provide seamless connectivity across National Highway 28.
Boosting Agriculture and Local Economy
Beyond passenger convenience, the project is expected to be a game-changer for the local economy. Officials, including Bihar PHED Minister Sanjay Singh, have highlighted that the line will provide a massive boost to the agricultural sector. Specifically, it will benefit the prominent vegetable markets in Tajpur and Motipur by providing faster access to larger markets, while also stimulating trade and creating new employment opportunities in the region.
New Stations and Historical Context
The proposed route will introduce several new stations to the network, including:
- Mahuwa Jalalpur
- Mukandpur
- Sultanpur Haq
- Harihar
Additionally, the project includes planned upgrades for the existing Bhagwanpur and Karpurigram stations to accommodate the increased traffic.
This project is the realization of a long-standing regional demand that dates back to the tenures of former Railway Ministers Ram Vilas Paswan and Lalu Prasad. It is now being prioritized as one of 29 new rail line projects across the state and is closely associated with the parliamentary constituency represented by Union Minister Chirag Paswan.