Bilaspur Division Alert: 27 Trains Affected by 12-Day Disruption
Major railway works between Champa and Naila will impact 27 trains in Bilaspur Division from Dec 6 to Dec 18, 2026. Check cancellations and delays.
Passengers traveling through Chhattisgarh's Bilaspur Division should prepare for significant changes to their travel plans. Major railway operations are set to face disruptions from December 6 to December 18, 2026, due to extensive infrastructure work being carried out between Champa and Naila stations.
The Fourth Line Project and Signaling Upgrades
The disruption is a result of critical engineering activities, including pre-non-interlocking, non-interlocking, and post-non-interlocking works. These tasks are part of the final phase of the 206-kilometer fourth railway line project connecting Bilaspur and Jharsuguda. The project aims to connect Champa station to the new fourth line and install advanced automatic signaling systems, which will eventually reduce congestion and improve operational efficiency for both freight and passenger traffic.
Impact on Train Schedules: Cancellations and Short-Terminations
A total of 27 trains will be impacted during this 12-day period. The disruption includes 10 complete cancellations, 6 short-terminations, and 11 trains facing delays.
Major Cancellations and Route Changes
Travelers should pay close attention to the following specific changes:
- Visakhapatnam-Korba Express (18518): This train will be cancelled between Bilaspur and Korba from December 6 to December 17.
- Korba-Visakhapatnam Express (18517): This service will be cancelled between Korba and Bilaspur; instead, it will commence its journey from Bilaspur between December 7 and December 18.
- Local Services: A total of 13 local trains will be cancelled, including the Raipur-Korba Passenger and the Raipur-Gevraroad MEMU.
- Major Expresses: Services such as the Chhattisgarh Express and Gondwana Express will be short-terminated or will originate from Bilaspur.
Train Delays and Special Passenger Services
While many trains are cancelled, several major services will continue to run with significant delays:
- The Visakhapatnam-Amritsar Express is scheduled to run one hour late on December 13, 14, and 15.
- The Utkal Express and Azad Hind Express will also experience delays.
To mitigate the inconvenience for commuters, the Korba-Raipur Hasdeo Express (18250/18249) will operate as a passenger train between Korba and Bilaspur from December 7 to December 18.
Railway officials strongly advise all passengers to check their train status through official channels before undertaking any journeys during this construction period.