Bullet Train Project: New high-speed corridor announced between Delhi and Siliguri

Kush Singh9 June 20262 min read0 viewsBullet Train
Bullet Train Project: New high-speed corridor announced between Delhi and Siliguri

Union Railway Minister Ashwini Vaishnav announced a new Bullet Train project connecting Delhi to Siliguri during his visit to Kolkata on June 6, 2026. This high-speed corridor will connect four major states including Delhi, Uttar Pradesh, Bihar, and West Bengal. The project aims to drastically reduce travel time between the national capital and North Bengal.

🗞️: Special Train Announcement: Indian Railways to run special service between Jammu and Haridwar for Somvati Amavasya

What is the route and travel time of the new Bullet Train

HelloRail की हर खबर सबसे पहलेJoin Channel

The high-speed rail will run from Delhi to Siliguri via Lucknow, Varanasi, and Patna. The journey, which currently takes around 20 hours, will be completed in just 6 hours. The project will be split into two main corridors: Delhi-Varanasi and Varanasi-Siliguri. The trains are designed to run at speeds between 300 to 350 km/h.

Key details of the Delhi-Siliguri corridor

Feature Details
Estimated Cost Over 1.5 Lakh Crore Rupees
Implementing Agency NHSRCL
Major Stations New Delhi, Noida (Jewar Airport), Mathura, Agra, Etawah, Lucknow, Prayagraj, Varanasi, Ghazipur, Patna, Siliguri (NJP)
Current Status Initial paperwork and upcoming land surveys
Future Extension Possible extension to Guwahati, Assam

How will this project impact connectivity

This will be India’s second bullet train project after the Mumbai-Ahmedabad corridor. It will provide a massive boost to the economy, trade, and tourism in North Bengal and the Northeast region. The National High-Speed Rail Corporation Limited (NHSRCL) will handle the Detailed Project Report (DPR) and feasibility studies in the coming months.

Frequently Asked Questions (FAQs)

Which cities will be covered in the Delhi-Siliguri Bullet Train route?

The route includes New Delhi, Noida (Jewar Airport), Mathura, Agra, Etawah, Lucknow, Prayagraj, Varanasi, Ghazipur, Patna, and Siliguri.

What is the expected speed and cost of this project?

The trains will run at 300 to 350 km/h, and the initial estimated cost is over 1.5 lakh crore rupees.

Share:

Comments

Leave a comment