High-Speed Rail to Noida International Airport: Jewar MLA Meets Railway Minister Ashwini Vaishnaw for Project Update

Kush Singh3 April 20262 min read0 viewsBullet Train
High-Speed Rail to Noida International Airport: Jewar MLA Meets Railway Minister Ashwini Vaishnaw for Project Update

Noida International Airport is preparing to launch as an integrated transport hub with high-speed rail connectivity. Jewar MLA Dhirendra Singh recently approached Union Railway Minister Ashwini Vaishnaw to discuss the progress of these vital rail links. The plan involves multiple projects including the Regional Rapid Transit System and the Delhi-Varanasi High-Speed Rail corridor to ensure fast access for travelers.

👉: Indian Railways restores MEMU and passenger trains until April 7, check full list of routes

What is the current status of the Ghaziabad-Jewar RRTS corridor?

HelloRail की हर खबर सबसे पहलेJoin Channel

The Ghaziabad-Jewar RRTS is a 72.44 km semi-high-speed rail corridor designed to link Ghaziabad and Noida with the upcoming airport. The Detailed Project Report has been finalized and forwarded to the Union Ministry of Housing and Urban Affairs for final processing. This project will feature 12 stations and is expected to cost around ₹20,360 crore. The corridor is designed for speeds of 180 km/h, making it possible to travel from Ghaziabad to the airport in less than 50 minutes.

Overview of rail connectivity and infrastructure plans

The airport will be connected through various rail formats to ensure it serves as a major logistics and passenger hub. The authorities are working on integrating Rapid Rail, Metro, and Light Rail Transit on the same track for the first time in India. The following table highlights the key projects and their features based on the latest reports.

Project/Feature Key Details
Ghaziabad-Jewar RRTS 72.44 km corridor with 12 stations
Delhi-Varanasi Bullet Train Reduces travel time to Delhi to 21 minutes
Namo Bharat Rapid Rail Proposed 72.44 km link with 22 stations
Estimated Project Cost Approximately ₹20,360 crore
Operational Speed 180 km/h maximum design speed
Phase-I Completion Estimated by June 2027
Railway Integration Connectivity to Delhi-Mumbai and Delhi-Howrah routes
Share:

Comments

Leave a comment