Kanpur Railway Update: New Juhi Railway Station proposed to reduce load on Kanpur Central

Indian Railways is planning to build a new terminal at Juhi Yard to ease the heavy traffic at Kanpur Central. The proposed station, also known as the Juhi Coaching Terminal, will be located between Kanpur Central and Govindpuri stations. This move comes as Kanpur Central is currently operating at 1.5 times its actual capacity.
🚨: Chenab Bridge: World’s highest railway arch bridge built in Jammu and Kashmir।
What are the key features of Juhi Railway Station?
The project is estimated to cost 90 crore rupees and will be developed in two phases. In the first phase, the railway will build four platforms, a station building, parking, and a circulating area. The second phase will add four more platforms to double the capacity. This station will work as a coaching terminal for train maintenance and stabling.
How will this project benefit passengers and operations?
The new station is located about 3 km from Kanpur Central and 500 meters from Govindpuri. It will help in reducing congestion and allow the introduction of new train routes on the Delhi-Howrah line. Senior DCM Himanshu Shukla confirmed that the proposal is with the Railway Board for final budget and approval.
| Feature | Details |
|---|---|
| Estimated Cost | 90 Crore Rupees |
| Total Platforms | 8 (4 in each phase) |
| Location | Juhi Yard, Kanpur |
| Primary Purpose | Coaching Terminal & Load Reduction |
Frequently Asked Questions (FAQs)
Juhi Railway Station कहाँ बनेगा और इसकी लागत क्या है?
यह स्टेशन कानपुर सेंट्रल से 3 किमी और गोविंदपुरी से 500 मीटर की दूरी पर Juhi Yard में बनेगा। इस प्रोजेक्ट की कुल अनुमानित लागत 90 करोड़ रुपये है।
इस नए स्टेशन से क्या फायदा होगा?
कानपुर सेंट्रल स्टेशन अपनी क्षमता से 1.5 गुना ज्यादा लोड ले रहा है। नए स्टेशन से भीड़ कम होगी और दिल्ली-हावड़ा रूट पर नई ट्रेनें चलाना आसान होगा।