• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Friday, July 31, 2026
HelloRail
  • News
  • Stories

    Dr. Ambedkar Nagar – New Delhi SF Express: Train consistently arrives early at Hazrat Nizamuddin, check details

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

  • Development

    Lucknow North MLA proposes renaming Mohibullapur railway station to Jankipuram

    Navalur station resumes freight operations with major machinery consignment to Rajasthan

    Indian Railways approves 519 crore infrastructure projects for station and track upgrades

    East Central Railway plans permanent closure of Saharsa gate 31 for yard remodeling

    North Western Railway to undertake track doubling work on Ajmer Chandaria section in late 2026

    Runicha Express diverted for track doubling work and Rani Khet Express gets LHB coach upgrade

    Indian Railways upgrades Ranikhet Express with modern LHB coaches for safer travel

    Indias longest rail grade separator in Katni nears completion to boost train speeds

    CONCOR launches double stack container train services from Dadri to JNPA on WDFC

  • Vande Bharat

    Indian Railways Begins High Speed Trials for New Vande Bharat Freight EMU Prototype

    India First Vande Bharat Freight EMU Achieves 145 kmph During Technical Trials

    Indias First Vande Bharat Freight EMU Hits 145 Kmph During High Speed Trials

    Nainital MP Ajay Bhatt pushes for daily Vande Bharat service between Kathgodam and Delhi

    Indian Railways begins trials for the first Vande Bharat Superfast Parcel Express

    Indian Railways begins trial runs for the first Vande Bharat superfast parcel train in Kota

    Indian Railways Boosts Capacity With New 16 Coach Vande Bharat Trainsets

    Andhra Pradesh gears up for its first Vande Bharat Sleeper train launch by Dussehra

    Indian Railways explains how distributed traction technology powers Vande Bharat performance

No Result
View All Result
HelloRail
  • News
  • Stories

    Dr. Ambedkar Nagar – New Delhi SF Express: Train consistently arrives early at Hazrat Nizamuddin, check details

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

  • Development

    Lucknow North MLA proposes renaming Mohibullapur railway station to Jankipuram

    Navalur station resumes freight operations with major machinery consignment to Rajasthan

    Indian Railways approves 519 crore infrastructure projects for station and track upgrades

    East Central Railway plans permanent closure of Saharsa gate 31 for yard remodeling

    North Western Railway to undertake track doubling work on Ajmer Chandaria section in late 2026

    Runicha Express diverted for track doubling work and Rani Khet Express gets LHB coach upgrade

    Indian Railways upgrades Ranikhet Express with modern LHB coaches for safer travel

    Indias longest rail grade separator in Katni nears completion to boost train speeds

    CONCOR launches double stack container train services from Dadri to JNPA on WDFC

  • Vande Bharat

    Indian Railways Begins High Speed Trials for New Vande Bharat Freight EMU Prototype

    India First Vande Bharat Freight EMU Achieves 145 kmph During Technical Trials

    Indias First Vande Bharat Freight EMU Hits 145 Kmph During High Speed Trials

    Nainital MP Ajay Bhatt pushes for daily Vande Bharat service between Kathgodam and Delhi

    Indian Railways begins trials for the first Vande Bharat Superfast Parcel Express

    Indian Railways begins trial runs for the first Vande Bharat superfast parcel train in Kota

    Indian Railways Boosts Capacity With New 16 Coach Vande Bharat Trainsets

    Andhra Pradesh gears up for its first Vande Bharat Sleeper train launch by Dussehra

    Indian Railways explains how distributed traction technology powers Vande Bharat performance

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Deoria Railway Station: Road from BRDBDPG College Gate to be rebuilt with 2 crore budget

Kush Singh by Kush Singh
May 2, 2026
in Development, News
0 0
0
Share on FacebookShare on Twitter

The road leading to the Deoria railway station is getting a major makeover. The government approved a project worth two crore rupees to reconstruct the dilapidated stretch from the BRDBDPG College Gate. This move will provide much-needed relief to passengers and locals who faced difficulties due to the poor condition of the road.

ADVERTISEMENT

What are the key details of the road project?

The Deoria Municipality has completed the tender process and work will begin soon. The project focuses on replacing the old road with a durable cement concrete (CC) surface and improving the surrounding infrastructure. The funds are allocated as follows:

Project Component Allocated Budget
Cement Concrete (CC) Road (Railway Tiraha to Station) 1 Crore Rupees
Permanent Drain and Slab (Southern Side) 90 Lakh Rupees
Street Lights Installation Remaining Funds

Why was the project delayed for four years?

The project remained stalled for about four years because the railway authorities had not issued the necessary No Objection Certificate (NOC). The situation changed when Municipal Chairman Shweta Jaiswal met senior railway officials in Varanasi to resolve the issue. After the NOC was granted, the government released the funds to start the construction.

ADVERTISEMENT

How is this different from the Amrit Bharat Station Scheme?

This road construction is a separate local project handled by the municipality. It is different from the larger redevelopment of Deoria Sadar Railway Station. The station modernization under the Amrit Bharat Station Scheme has a much larger budget of approximately 60.64 crore to 61 crore rupees for overall facilities and parking.

Frequently Asked Questions (FAQs)

What will be the new features of the Deoria station road?

The road will be built using cement concrete (CC) and will include a permanent drainage system on the southern side and new street lights for better visibility.

Who is responsible for the execution of this road work?

The Deoria Municipality is responsible for overseeing the construction and has already completed the tender process after receiving the NOC from the railway.

{“@context”: “https://schema.org”, “@type”: “FAQPage”, “mainEntity”: [{“@type”: “Question”, “name”: “What will be the new features of the Deoria station road?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “The road will be built using cement concrete (CC) and will include a permanent drainage system on the southern side and new street lights for better visibility.”}}, {“@type”: “Question”, “name”: “Who is responsible for the execution of this road work?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “The Deoria Municipality is responsible for overseeing the construction and has already completed the tender process after receiving the NOC from the railway.”}}]}

Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat