Jaipur Railway Update: Khatipura station to be developed as a mega terminal to reduce load on Jaipur Junction

Kush Singh28 April 20262 min read1 viewDevelopment
Jaipur Railway Update: Khatipura station to be developed as a mega terminal to reduce load on Jaipur Junction

Indian Railways is transforming Khatipura station into a modern mega terminal to ease the heavy traffic at Jaipur Junction. This project, first announced in the 2018-19 rail budget, aims to strengthen the railway infrastructure in Jaipur. The development is being led by the North Western Railway (NWR) with an investment of approximately ₹205 crore.

What are the key features of the new Khatipura Mega Terminal?

The station will feature 6 high-level platforms and 8 lines to make boarding and exiting easier for elderly people, women, and divyangjan. The main building and entrance are being designed in the traditional Rajasthani architectural style. Additionally, new stabling lines have been built to park trains after their operations, which will help in running more long-distance trains on the Delhi corridor.

HelloRail की हर खबर सबसे पहलेJoin Channel

What facilities will be available at the new Coach Care Complex?

A state-of-the-art Coach Care Complex is being built at a cost of ₹205 crore. This hub will handle the maintenance of Vande Bharat, LHB, and DEMU train rakes. The complex includes the following modern facilities:

Facility Description
Washing Plant Automatic coach washing system
Wheel Management Computerized wheel profile management system
Lifting Unit Advanced coach lifting units
Water Plant Water recycling plant
Equipment High-capacity cranes
Linen Care Two-story building for linen maintenance

How will this project impact passengers and operations?

General Manager of NWR, Amitabh, stated on April 18, 2026, that all new services from the Jaipur region will be operated and maintained from Khatipura. By developing it as a satellite terminal, the pressure on Jaipur Junction will decrease. This will allow the railway administration to introduce more long-distance trains and improve overall passenger convenience.

Frequently Asked Questions (FAQs)

What is the total cost of the Khatipura station redevelopment?

The project is being developed with an approximate cost of ₹205 crore, which includes the construction of a modern Coach Care Complex.

Which trains will be maintained at the Khatipura hub?

The station is being developed as a maintenance hub for all types of rakes, including Vande Bharat, LHB, and DEMU trains.

{“@context”: “https://schema.org”, “@type”: “FAQPage”, “mainEntity”: [{“@type”: “Question”, “name”: “What is the total cost of the Khatipura station redevelopment?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “The project is being developed with an approximate cost of ₹205 crore, which includes the construction of a modern Coach Care Complex.”}}, {“@type”: “Question”, “name”: “Which trains will be maintained at the Khatipura hub?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “The station is being developed as a maintenance hub for all types of rakes, including Vande Bharat, LHB, and DEMU trains.”}}]}

Share:

Comments

Leave a comment