What’s inside:
Write 1–2 short lines clearly stating what information this article gives. Keep it crisp and factual.
India’s Bullet Train project in Maharashtra’s Palghar district reaches a milestone as Rail Minister Ashwini Vaishnav oversees the completion of a 1.5-kilometer tunnel excavation online from New Delhi.
The newly excavated tunnel is one of the longest in Palghar district and connects Virar and Boisar Bullet Train stations in Maharashtra, marking the completion of the second tunnel in the state.
The Mumbai-Ahmedabad Bullet Train project will reduce travel time between the two cities to just 2 hours and 17 minutes, covering a distance of 508 kilometers and passing through Gujarat, Maharashtra, and Dadra and Nagar Haveli.
The project includes a total of seven mountain tunnels, with the excavation of the ‘Mountain Tunnel-Five’ being a significant achievement. There are 12 stations in total, including Mumbai, Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad, and Sabarmati.
With Japan’s technical and financial assistance, this Bullet Train project is set to revolutionize rail travel in India, offering high-speed trains that can cover the entire distance in just 2 hours and 17 minutes.
Summary:
- Completion of a 1.5-kilometer tunnel excavation in Palghar district, Maharashtra.
- Mumbai-Ahmedabad Bullet Train project to reduce travel time to 2 hours and 17 minutes.
- Seven mountain tunnels and 12 stations included in the project.
- Significant milestone achieved with the completion of ‘Mountain Tunnel-Five’ excavation.
- Japan’s assistance driving the high-speed rail project for faster and efficient travel.







