• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Saturday, May 16, 2026
HelloRail
  • News
  • Stories

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

    Etihad Rail Runs Special Trains: Free Ride for Stranded Residents from Saudi Border to Abu Dhabi

    South Bihar Express Passenger Gives Birth to Baby Girl at Jhajha Railway Station

    The Free Train Of India. Bhakra Nangal Train Will Take You From Punjab to Himachal via Mountains.

  • Development

    Gorakhpur Junction: Multi-level parking to be built, old cycle stand to close soon

    Haridwar-Dehradun Rail Line: Second track to be laid through Rajaji Tiger Reserve

    Amethi Railway Station: Redevelopment work under Amrit Bharat Scheme to give station a new look

    RailOne App: Indian Railways introduces AI feature to predict waiting list confirmation chances

    Ravi River Bridge: Northern Railway completes reconstruction of Bridge No. 17 in record time

    Rajasthan Infrastructure: Development projects worth ₹400 crore launched by Union and State Ministers

    Gorakhpur Junction Mega Upgrade: 11 platforms and 10 mini bridges to be built

    Baghha Railway Crossing 50-C: Technical glitch causes traffic jam and commuters face heat

    Bag Express Update: Modern LHB coaches to be introduced on Howrah-Kathgodam route

  • Vande Bharat

    Patna-Howrah Vande Bharat Express: New stoppage at Jamui station announced, check timings

    Patna-Howrah Vande Bharat Express: Stop started at Jamui railway station, check timings

    Vande Bharat Express: Train halted for 75 minutes in Pratapgarh due to fallen tree

    Jammu-Srinagar Vande Bharat Express: Over 45,000 passengers travel in first 10 days

    New Train Announcement: Indian Railways to launch superfast service between Bengaluru and Mumbai

    Patliputra Vande Bharat Express: Low occupancy and high fares lead to poor passenger turnout

    Vande Bharat Express: New sleeper train planned between Delhi and Howrah via Patna, check details

    Vande Metro Update: Indian Railways to replace local trains with Namo Bharat Rapid Rail on key routes

    New Vande Bharat Express: First trainset from MCF Raebareli departs for Delhi-Howrah route trials

No Result
View All Result
HelloRail
  • News
  • Stories

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

    Etihad Rail Runs Special Trains: Free Ride for Stranded Residents from Saudi Border to Abu Dhabi

    South Bihar Express Passenger Gives Birth to Baby Girl at Jhajha Railway Station

    The Free Train Of India. Bhakra Nangal Train Will Take You From Punjab to Himachal via Mountains.

  • Development

    Gorakhpur Junction: Multi-level parking to be built, old cycle stand to close soon

    Haridwar-Dehradun Rail Line: Second track to be laid through Rajaji Tiger Reserve

    Amethi Railway Station: Redevelopment work under Amrit Bharat Scheme to give station a new look

    RailOne App: Indian Railways introduces AI feature to predict waiting list confirmation chances

    Ravi River Bridge: Northern Railway completes reconstruction of Bridge No. 17 in record time

    Rajasthan Infrastructure: Development projects worth ₹400 crore launched by Union and State Ministers

    Gorakhpur Junction Mega Upgrade: 11 platforms and 10 mini bridges to be built

    Baghha Railway Crossing 50-C: Technical glitch causes traffic jam and commuters face heat

    Bag Express Update: Modern LHB coaches to be introduced on Howrah-Kathgodam route

  • Vande Bharat

    Patna-Howrah Vande Bharat Express: New stoppage at Jamui station announced, check timings

    Patna-Howrah Vande Bharat Express: Stop started at Jamui railway station, check timings

    Vande Bharat Express: Train halted for 75 minutes in Pratapgarh due to fallen tree

    Jammu-Srinagar Vande Bharat Express: Over 45,000 passengers travel in first 10 days

    New Train Announcement: Indian Railways to launch superfast service between Bengaluru and Mumbai

    Patliputra Vande Bharat Express: Low occupancy and high fares lead to poor passenger turnout

    Vande Bharat Express: New sleeper train planned between Delhi and Howrah via Patna, check details

    Vande Metro Update: Indian Railways to replace local trains with Namo Bharat Rapid Rail on key routes

    New Vande Bharat Express: First trainset from MCF Raebareli departs for Delhi-Howrah route trials

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Delhi-Ambala Rail Project: Center Clears 5,983 Crore Budget for 3rd and 4th Lines to Decongest Route

Kush Singh by Kush Singh
February 15, 2026
in Development, News, Vande Bharat
0 0
0
Share on FacebookShare on Twitter

The Central Government has approved the construction of two additional railway lines on the Delhi-Ambala section to improve train operations in Northern India. This project covers a 194 km stretch and is vital for connecting Delhi with Haryana, Punjab, Himachal Pradesh, and Jammu & Kashmir. The Cabinet Committee on Economic Affairs, led by Prime Minister Narendra Modi, sanctioned the project on February 13, 2026. This expansion will significantly reduce travel time for passengers heading towards Srinagar and Mata Vaishno Devi.

ADVERTISEMENT

🗞️: Aunrihar-Varanasi 3rd Rail Line Sanctioned: Indian Railways to Spend ₹497 Crore to End Train Congestion।

Project Details and Construction Timeline

The total cost of the Delhi-Ambala expansion is estimated at 5,983 crore and is scheduled for completion by 2030. A total of 415 km of new track will be laid to facilitate the third and fourth lines. The infrastructure plan includes one important bridge, 28 major bridges, and 178 minor bridges. To ensure smooth road traffic, 2 road overbridges and 79 underbridges will also be constructed. Railway officials stated that no major land acquisition is required as the work will stay within existing railway territory.

ADVERTISEMENT

Expected Benefits for Passengers and National Security

Union Minister Ashwini Vaishnaw highlighted that these new lines will separate passenger and freight traffic, which is currently causing delays. This separation will allow premium trains like Vande Bharat, Shatabdi, and Rajdhani to run more efficiently. Beyond passenger comfort, the project holds strategic importance for the rapid movement of defense equipment and troops to the Jammu and Kashmir border regions. The project is part of the PM Gati-Shakti National Master Plan for multi-modal connectivity.

Feature Details
Total Distance 194 km
New Track Length 415 km
Freight Capacity Addition 24.6 million tonnes annually
Employment Generation 132 lakh human-days
CO2 Emission Reduction 43 crore kg annually
Logistics Cost Savings 952 crore per year
Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat