Rewari LC-4C Level Crossing Closure: Plan Your Route Nov 4-6
Rewari's LC-4C level crossing near Sultanpur will close from Nov 4-6, 2026, for track and road maintenance. Use alternative routes to avoid delays.

Commuters and motorists traveling near Rewari should prepare for a brief but significant disruption in local traffic. Railway Level Crossing No. LC-4C, located near Sultanpur village, is scheduled to shut down completely for three days this November.
Essential Maintenance on Tracks and Roads
The closure is set to take place from November 4 to November 6, 2026. This shutdown is necessary to facilitate critical maintenance work that targets both the railway tracks and the road surface in the immediate area. Ensuring the integrity of both the rail line and the connecting road is vital for long-term safety and smooth transit.
All Vehicles Prohibited During Closure
During this three-day maintenance window, the movement of all vehicle types will be strictly prohibited at the crossing. This restriction applies to the route near the Gurugram-Farrukhnagar road, meaning motorists will not be able to cross the tracks at this specific point.
To prevent commuters from facing unexpected delays or getting stuck in traffic, authorities have issued an official advisory. Motorists are strongly urged to utilize alternative routes to bypass the Sultanpur area during the maintenance period.
Separate from the Major ROB Project
It is important for residents to distinguish this short-term maintenance from the larger infrastructure developments in the region. While this closure is a localized effort to repair LC-4C, it is distinct from the major project approved by the state government in August 2026. That broader initiative aims to construct an integrated Railway Overbridge (ROB) in Rewari, which is designed to replace three high-traffic level crossings across the district to improve long-term connectivity.