RVNL Bags Rs 348 Cr Wagon Workshop Expansion in Visakhapatnam
Rail Vikas Nigam Limited (RVNL) has emerged as the lowest bidder for a Rs 348.49 crore project to double wagon overhaul capacity in Visakhapatnam.

Rail Vikas Nigam Limited (RVNL) has emerged as the lowest bidder for a massive RVNL wagon workshop expansion project in Visakhapatnam, Andhra Pradesh. The company has secured the L1 position for a major infrastructure undertaking valued at Rs 348.49 crore, aimed at significantly boosting the capacity of the Vadlapudi workshop.
Doubling the Freight Wagon Overhaul Capacity
The project, commissioned by the East Coast Railway's Waltair division, is designed to enhance the maintenance capabilities of the Indian Railways' freight fleet. The primary objective is to double the monthly output of the workshop's Periodic Overhauling (POH) services.
Currently, the Vadlapudi facility is capable of performing the scheduled overhaul of 300 freight wagons per month. Following the proposed expansion, this capacity is expected to jump to 600 wagons per month, ensuring a much smoother and faster turnaround for freight rolling stock.
Project Details and Execution Timeline
According to the official filing made by RVNL to the National Stock Exchange (NSE) and BSE, the key details of the project are as follows:
- Estimated Project Value: Rs 348.49 crore (including taxes).
- Contract Type: Engineering, Procurement, and Construction (EPC).
- Execution Period: 24 months.
While RVNL has successfully emerged as the lowest bidder (L1), the company noted that a formal award of the contract has not yet been officially announced.
A Strategic Return to Vadlapudi
This expansion marks a significant development for RVNL, as the company was responsible for commissioning the original Vadlapudi workshop. The existing facility was built on 203 acres of railway land and includes essential workshop sheds and three dedicated rail lines for the movement of wagons.
The original workshop was sanctioned during the 2015-16 Railway Budget. At the time of its construction, the project cost was approximately Rs 360 crore. The Ministry of Railways had selected the Vadlapudi site following a feasibility study, citing its operational advantages, the availability of water, and the strategic use of existing railway land.