Chhath Puja Saharsa Crowd Control: Samastipur Tightens Security

Samastipur Division implements strict Chhath Puja Saharsa crowd control measures, including platform ticket bans and a dedicated War Room.

Kush Singh12 November 20262 min read0 viewsNews
Chhath Puja Saharsa Crowd Control: Samastipur Tightens Security

To manage the massive influx of devotees during the upcoming festival, the Samastipur Division of East Central Railway has implemented strict Chhath Puja Saharsa crowd control measures across Saharsa and 12 other major stations. With an estimated 50,000 passengers expected to arrive at Saharsa station alone, railway authorities and the local District Magistrate are working in tandem to ensure passenger safety and smooth operations.

Strict Restrictions on Platform Access and Parcels

In an effort to prevent overcrowding and potential stampedes, the division has announced several critical changes to station operations. To ensure that only valid travelers occupy the station premises, authorities have suspended the sale of platform tickets at 13 key stations. This restriction will remain in effect from November 12 to November 25, 2026.

HelloRail की हर खबर सबसे पहलेJoin Channel

Furthermore, to minimize congestion within the station grounds, all inward and outward parcel bookings have been suspended. This suspension will be active between November 14 and November 25, 2026, allowing the railway staff to focus entirely on passenger movement.

Advanced Surveillance and the Dedicated 'War Room'

Safety monitoring will be heightened through 24-hour CCTV surveillance across all station premises. A specialized 'War Room' will be activated from November 16 to November 25, 2026, to serve as a central command hub. This facility will be staffed by experts from the following departments:

  • Operations Department
  • Commercial Department
  • Railway Protection Force (RPF)

For passengers requiring immediate assistance or information, a dedicated helpline has been established:

Emergency Helpline: 9263011881

Logistical Readiness and Safety Protocols

To accommodate sudden surges in passenger numbers, the Samastipur Division has mandated that extra rakes and coaches be kept on standby at Saharsa and other critical hubs. Additionally, railway staff have received specific instructions to minimize last-minute platform changes, a move designed to prevent confusion and chaos during peak hours.

Safety inspections are also being intensified by the RPF. To ensure the safety of all passengers on board, there is a strict ban on the carriage of firecrackers and any other flammable materials on all trains passing through the region.

Key Infrastructure Improvements

To manage the flow of people safely, designated holding areas are being set up at 13 major stations. These areas will be equipped with:

  • Secure barricading to manage inflow
  • Enhanced lighting for nighttime safety
  • Waterproof tents to protect passengers from the elements
Share:

Comments

Leave a comment