Suriawan Railway Crossing to Close for Maintenance on Oct 17-18

Commuters and motorists in the Suriawan area should prepare for significant travel disruptions over the coming days. The Suriawan railway crossing is set to close for two consecutive days to allow for essential maintenance and repair work.
Closure Schedule and Timing
To facilitate these necessary repairs, the crossing will be inaccessible to all road traffic during specific hours on both days. The scheduled closure is as follows:
- Dates: October 17 and October 18
- Daily Closure Window: 8:00 AM to 4:00 PM
Motorists and local residents are strongly advised to plan their travel routes in advance to avoid potential delays during this eight-hour daily maintenance window.
Long-Term Infrastructure Improvements
While this immediate closure is required for urgent repairs, it comes alongside broader infrastructure developments in the region. An overbridge is currently under construction in Suriawan, a project specifically designed to alleviate long-term traffic congestion at the railway gate and improve the overall flow of movement for the community.