Train services on the Samastipur-Darbhanga section remained suspended for 55 minutes on Sunday. The disruption happened because a railway crossing remained unattended, leaving passengers stranded in the intense summer heat. The incident occurred at Gumti number 1AC between 2:02 PM and 2:56 PM.
Which trains were affected by this delay?
Several trains faced operational delays due to the closed section. The impact was seen on the following services:
| Train Name/Number | Impact |
|---|---|
| Jaynagar Express (15553) | Operation affected |
| Samastipur–Darbhanga DEMU (75209) | Operation affected |
| Bagmati Express (12578) | Operation affected |
| Ara Intercity (13225) | Stopped at Kishanpur station |
What caused the departmental negligence?
The responsibility for operating the Gumti had been transferred from the Engineering Department to the Operations Department. However, the assigned staff from the Operations Department did not reach the spot on time on Sunday. This lack of coordination between departments led to the crossing remaining open, which stopped the trains.
What action is the Railway administration taking?
DRM of Samastipur Division, Jyoti Prakash Mishra, has ordered a full inquiry into the matter. RPF personnel were sent to the location once the situation was reported. The administration will fix responsibility on the negligent staff to ensure such incidents do not happen again in the future.
Frequently Asked Questions (FAQs)
समस्तीपुर-दरभंगा रेलखंड पर ट्रेनें क्यों रुकी थीं?
गुमटी संख्या 1एसी पर गेट बंद करने वाला कर्मचारी समय पर नहीं पहुंचा, जिससे विभागीय लापरवाही के कारण 55 मिनट तक परिचालन बाधित रहा।
इस घटना से कौन सी प्रमुख ट्रेनें प्रभावित हुईं?
जयनगर एक्सप्रेस, बागमती एक्सप्रेस और समस्तीपुर-दरभंगा डेमू प्रभावित हुए, जबकि आरा इंटरसिटी को किशनपुर स्टेशन पर रोकना पड़ा।


























