The Izzatnagar Division of North Eastern Railway has announced a temporary closure of a key level crossing on the Kasganj-Dorai route. This closure is necessary to carry out essential repair work on the tracks. Road traffic will be completely stopped for a specific duration to ensure the safety of the workers and the quality of the repairs.
ЁЯУ░: Mumbai Division Signal Work: 10 trains affected on Udhna-Jalgaon route, check detailsред
When will the level crossing be closed?
The road traffic at level crossing number 306C will be shut down starting from 4:00 PM on May 13, 2026. The closure will continue until 6:00 AM on May 14, 2026. In total, the crossing will remain closed for 14 hours, affecting commuters using this specific route.
Key details of the traffic disruption
- Affected Route: Kasganj-Dorai
- Level Crossing Number: 306C
- Start Time: 13 May 2026, 4:00 PM
- End Time: 14 May 2026, 6:00 AM
- Total Duration: 14 Hours
- Authority: Izzatnagar Division, North Eastern Railway
Frequently Asked Questions (FAQs)
рдХрд╛рд╕рдЧрдВрдЬ-рдбреЛрд░рд╛рдИ рдорд╛рд░реНрдЧ рдкрд░ рдХреМрди рд╕рд╛ рд╕рдордкрд╛рд░ рдмрдВрдж рд░рд╣реЗрдЧрд╛?
рдкреВрд░реНрд╡реЛрддреНрддрд░ рд░реЗрд▓рд╡реЗ рдХреЗ рдЗрдЬреНрдЬрддрдирдЧрд░ рдордВрдбрд▓ рдХреЗ рдЕрдиреБрд╕рд╛рд░, рдЗрд╕ рдорд╛рд░реНрдЧ рдкрд░ рд╕реНрдерд┐рдд рд╕рдордкрд╛рд░ рд╕рдВрдЦреНрдпрд╛ 306C рдХреЛ рдорд░рдореНрдордд рдХрд╛рд░реНрдп рдХреЗ рд▓рд┐рдП рдмрдВрдж рд░рдЦрд╛ рдЬрд╛рдПрдЧрд╛ред
рдпрд╛рддрд╛рдпрд╛рдд рдХрд┐рддрдиреЗ рд╕рдордп рдХреЗ рд▓рд┐рдП рдмрд╛рдзрд┐рдд рд░рд╣реЗрдЧрд╛?
рд╕рдбрд╝рдХ рдпрд╛рддрд╛рдпрд╛рдд 13 рдордИ 2026 рдХреЛ рд╢рд╛рдо 4:00 рдмрдЬреЗ рд╕реЗ 14 рдордИ 2026 рдХреЛ рд╕реБрдмрд╣ 6:00 рдмрдЬреЗ рддрдХ, рдХреБрд▓ 14 рдШрдВрдЯреЗ рдХреЗ рд▓рд┐рдП рдмрдВрдж рд░рд╣реЗрдЧрд╛ред



























