The Samastipur Railway Division is taking a major step to reduce accidents and negligence at railway crossings. To ensure better security, the administration will install CCTV cameras at 152 level crossings. These cameras will allow officials to monitor the gates in real-time and take quick action to prevent mishaps.
📰: Bilaspur Railway Station: Gate number 4 to close from July 10 for redevelopment work।
What are the key features of the new security plan?
The project focuses on real-time monitoring to stop carelessness at railway gates. Following directions from Union Railway Minister Ashwini Vaishnaw, these systems will use best-in-class equipment. To ensure the cameras work without interruption, the railways will provide solar panels, battery backups, and UPS for a steady power supply.
What other upgrades are happening in Samastipur Division?
Apart from the 152 crossings, several other security measures are being implemented across the division to protect passengers and property:
| Project/Update | Details |
|---|---|
| Samastipur-Muzaffarpur Section | ₹1.61 crore project for CCTV, sirens, and LED lighting |
| Special Category Crossings | Budget of over ₹66 lakh allocated for specific CCTV needs |
| Station Security | Face Recognition Systems (FRS) installed at major stations |
| RPF Equipment | 20 new GPS-enabled body-worn cameras added for staff |
| Central Monitoring | All feeds linked to a central control room in Samastipur |
How will this help common passengers and commuters?
Live feeds from these cameras will be monitored by the Station Master and the Control Office. This helps in the safe dispatch of trains and makes it easier to identify people who trespass or break rules. The use of modern technology like FRS and GPS cameras will make the railway premises safer for everyone traveling through the Samastipur division.
Frequently Asked Questions (FAQs)
How many level crossings will get CCTV in Samastipur Division?
The Samastipur Railway Division plans to install CCTV cameras at 152 railway level crossings for real-time monitoring and safety.
What is the budget for the Samastipur-Muzaffarpur section modernization?
The Railway Administration approved a project worth approximately ₹1.61 crore for CCTV, interlocking systems, sirens, and LED lighting on this section.



























