Hapur Traffic Update: Meerut Road Railway Over Bridge to close for 10 days, check dates

Kush Singh13 May 20261 min read0 viewsImportant
Hapur Traffic Update: Meerut Road Railway Over Bridge to close for 10 days, check dates

The Meerut Road Railway Over Bridge in Hapur will remain closed for 10 days starting from May 14, 2026. This closure is necessary to carry out essential repair work on the bridge to ensure safety. The bridge is located on the Meerut-Bulandshahr route within the Hapur urban area.

🚨: Jhalawar-Kota Road Diversion: Traffic routes changed for RUB construction, check dates and alternative paths

When will the bridge be closed and for how long

HelloRail की हर खबर सबसे पहलेJoin Channel

The closure will be effective from May 14 to May 23, 2026. For a total of 10 days, no vehicles will be allowed to use this bridge. This period has been set aside to complete the maintenance work without any traffic interference.

Who is responsible for the repair work

The Lok Nirman Vibhag Hapur, also known as the Public Works Department, will handle the repair operations. They will work on the bridge situated on the Meerut-Bulandshahr Marg to fix the structural issues in the Hapur urban section.

Key Details of the Bridge Closure

Detail Information
Closure Dates May 14 to May 23, 2026
Total Duration 10 Days
Location Meerut-Bulandshahr Marg (Hapur Urban)
Executing Agency Lok Nirman Vibhag Hapur (PWD)
Reason Necessary repair work

Frequently Asked Questions (FAQs)

मेरठ रोड रेलवे ओवर ब्रिज कब से कब तक बंद रहेगा?

यह पुल 14 मई 2026 से 23 मई 2026 तक कुल 10 दिनों के लिए बंद रहेगा।

पुल बंद होने का मुख्य कारण क्या है?

लोक निर्माण विभाग हापुड़ द्वारा पुल की जरूरी मरम्मत का कार्य किया जाएगा, जिसके कारण इसे बंद रखा गया है।

Share:

Comments

Leave a comment