With the monsoon season bringing heavy rainfall alerts across North India, the North Central Railway (NCR) has launched a comprehensive safety drive to ensure the seamless operation of trains. General Manager Naresh Pal Singh held a high-level review meeting in Prayagraj on Wednesday, July 22, 2026, to issue strict directives regarding infrastructure stability and emergency response protocols.
- Strict field inspections: Officials must conduct personal site visits to sensitive sections instead of relying on paper reports.
- Enhanced patrolling: Dedicated teams are monitoring tracks between every three stations from July 20 to August 30.
- Emergency readiness: ‘Monsoon Wagons’ are fully stocked, and engineering teams are on 24-hour high alert.
- Data-driven approach: NCR has identified potential waterlogging sites based on the last five years of rainfall data.
Focus on Track and Bridge Safety
During the meeting, the General Manager emphasized that safety cannot be compromised during the wet season. Key instructions include the continuous monitoring of water levels in rivers and railway bridges, particularly in regions prone to flash floods. Maintenance teams have been ordered to conduct rigorous checks on railway tracks, ballast, and signaling systems to prevent technical failures caused by heavy downpours.
These precautionary measures come in response to recent alerts from the Indian Meteorological Department (IMD), which has predicted heavy rainfall and thunderstorms across 18 states, including Delhi and Uttar Pradesh. By leveraging historical data, the railway aims to proactively address issues at known waterlogging hotspots before they impact passenger services.
Safety Record and Commitment
The proactive stance of the NCR aligns with the national railway safety goals. Recent data shared by Union Railway Minister Ashwini Vaishnaw in the Lok Sabha revealed that only two major rail accidents occurred in the 2026-27 period up to June 2026. This downward trend is attributed to the integration of modern safety technology and improved maintenance standards. By keeping infrastructure teams on 24-hour alert throughout the monsoon period, the North Central Railway aims to maintain this high safety standard and minimize travel disruptions for thousands of daily passengers.



























