• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Monday, February 9, 2026
HelloRail
  • News
  • Stories

    The Free Train Of India. Bhakra Nangal Train Will Take You From Punjab to Himachal via Mountains.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

  • Development

    Malda Division Closes 7 Crossings on Dumka Route, Heavy Fine for Trespassing

    NH 333A Widening Project Fast Tracked, Sheikhpura to Banka Journey to Become Faster with 14 New Bypasses

    Western Railway catches 1 Lakh passengers in AC Local without ticket, collects 3.38 Crore fine

    Indian Railways Announces Gondia Chhapra Special Train for Holi 2026, Check Full Schedule

    Delhi Metro Phase V: New 9.9 km underground line to connect Central Delhi, check 9 station list

    Mithila-Kosi Rail Project Gets Push, Ministry Sends 2376 Crore Proposal to NITI Aayog

    Bharat Gaurav Train to Cover Eastern Temples from March 9, Package Starts at Rs 79,285

    Vande Bharat Sleeper Menu Revised, IRCTC Adds Chicken and Regional Dishes for Howrah-Kamakhya Route

    Semra Station in Bihar to Get Big Cargo Terminal, Hundreds of Locals to Get Jobs

  • Vande Bharat

    Malda Division Closes 7 Crossings on Dumka Route, Heavy Fine for Trespassing

    Vande Bharat Sleeper Menu Revised, IRCTC Adds Chicken and Regional Dishes for Howrah-Kamakhya Route

    HelloRail.in Coverage Featured Image

    IRCTC Introduces Non-Vegetarian Meal Options on Vande Bharat Sleeper Train from Howrah to Kamakhya Following Passenger Feedback

    HelloRail.in Coverage Featured Image

    Vande Bharat Express Tailored for Kashmir’s Harsh Winters Gains Popularity Amid Restored Services Post-Disasters

    HelloRail.in Coverage Featured Image

    Center Halts Three Proposed Rail Projects in Jammu-Kashmir Due to Local Concerns, Says Union Minister Ashwini Vaishnaw

    HelloRail.in Coverage Featured Image

    Dense Fog Delays 37 Trains by Up to 11 Hours at Kanpur Central Station, Passengers Left Frustrated

    Odisha gets massive 10928 Crore budget for Railways, new era begins with 6 Vande Bharat trains

    HelloRail.in Coverage Featured Image

    Bihar Railway Budget Soars to ₹10,379 Crore, Promises Major Infrastructure Upgrades and High-Speed Corridors

    HelloRail.in Coverage Featured Image

    UP Railway Development Boosted with ₹20,012 Crore Budget; High-Speed Routes to Cut Delhi-Varanasi Travel to 3.55 Hours

No Result
View All Result
HelloRail
  • News
  • Stories

    The Free Train Of India. Bhakra Nangal Train Will Take You From Punjab to Himachal via Mountains.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

  • Development

    Malda Division Closes 7 Crossings on Dumka Route, Heavy Fine for Trespassing

    NH 333A Widening Project Fast Tracked, Sheikhpura to Banka Journey to Become Faster with 14 New Bypasses

    Western Railway catches 1 Lakh passengers in AC Local without ticket, collects 3.38 Crore fine

    Indian Railways Announces Gondia Chhapra Special Train for Holi 2026, Check Full Schedule

    Delhi Metro Phase V: New 9.9 km underground line to connect Central Delhi, check 9 station list

    Mithila-Kosi Rail Project Gets Push, Ministry Sends 2376 Crore Proposal to NITI Aayog

    Bharat Gaurav Train to Cover Eastern Temples from March 9, Package Starts at Rs 79,285

    Vande Bharat Sleeper Menu Revised, IRCTC Adds Chicken and Regional Dishes for Howrah-Kamakhya Route

    Semra Station in Bihar to Get Big Cargo Terminal, Hundreds of Locals to Get Jobs

  • Vande Bharat

    Malda Division Closes 7 Crossings on Dumka Route, Heavy Fine for Trespassing

    Vande Bharat Sleeper Menu Revised, IRCTC Adds Chicken and Regional Dishes for Howrah-Kamakhya Route

    HelloRail.in Coverage Featured Image

    IRCTC Introduces Non-Vegetarian Meal Options on Vande Bharat Sleeper Train from Howrah to Kamakhya Following Passenger Feedback

    HelloRail.in Coverage Featured Image

    Vande Bharat Express Tailored for Kashmir’s Harsh Winters Gains Popularity Amid Restored Services Post-Disasters

    HelloRail.in Coverage Featured Image

    Center Halts Three Proposed Rail Projects in Jammu-Kashmir Due to Local Concerns, Says Union Minister Ashwini Vaishnaw

    HelloRail.in Coverage Featured Image

    Dense Fog Delays 37 Trains by Up to 11 Hours at Kanpur Central Station, Passengers Left Frustrated

    Odisha gets massive 10928 Crore budget for Railways, new era begins with 6 Vande Bharat trains

    HelloRail.in Coverage Featured Image

    Bihar Railway Budget Soars to ₹10,379 Crore, Promises Major Infrastructure Upgrades and High-Speed Corridors

    HelloRail.in Coverage Featured Image

    UP Railway Development Boosted with ₹20,012 Crore Budget; High-Speed Routes to Cut Delhi-Varanasi Travel to 3.55 Hours

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Delhi Metro Phase V: New 9.9 km underground line to connect Central Delhi, check 9 station list

Kush Singh by Kush Singh
February 9, 2026
in Development, News
0 0
0
Share on FacebookShare on Twitter

The Delhi Metro Rail Corporation (DMRC) has shared a significant update regarding the Phase V expansion as of February 7, 2026. A new 9.9 km long underground corridor will now connect Ramakrishna Ashram Marg to Indraprastha. This project is an extension of the existing Magenta Line and is designed to ease mobility in the busy Central Delhi area. Officials released a video highlighting how this new route will save travel time for daily commuters.

ADVERTISEMENT

Which stations are included in the new corridor?

This section of the Magenta Line will feature nine new stations. The entire stretch is underground to avoid traffic disruption on the surface. It connects major government buildings, courts, and tourist spots directly to the metro network. The list of stations includes:

  • Ramakrishna Ashram Marg (Interchange with Blue Line)
  • Shivaji Stadium (Interchange with Airport Express)
  • Central Secretariat (Interchange with Yellow & Violet Lines)
  • Kartavya Bhawan
  • India Gate
  • War Memorial–High Court
  • Baroda House
  • Bharat Mandapam (Pragati Maidan)
  • Indraprastha (Interchange with Blue Line)

What are the costs and new features?

The estimated cost for this Phase V (A) package is ₹12,014.91 crore. This funding is shared between the Central Government, the Delhi Government, and international loans. The DMRC is using advanced technology for this line. The trains will operate with Unattended Train Operations (UTO), which means they are driverless. For passenger safety, full-height Platform Screen Doors (PSDs) will be installed at all nine stations.

ADVERTISEMENT

Recent updates on station names and construction

In another recent development, the DMRC officially renamed the Mayur Vihar Pocket 1 Metro station to “Shree Ram Mandir Mayur Vihar” on February 7. Additionally, the corporation is now using an AI-powered system with drones to monitor construction work in real-time. This technology helps in tracking progress and ensuring safety standards during the building of these underground tunnels.

Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9504756906
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat