• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Wednesday, July 29, 2026
HelloRail
  • News
  • Stories

    Dr. Ambedkar Nagar – New Delhi SF Express: Train consistently arrives early at Hazrat Nizamuddin, check details

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

  • Development

    Northeast Railway Boosts Logistics with High Tech Gati Shakti Cargo Terminals

    Indian Railways successfully operates first direct container train to Nepal

    RVNL bags 358 Crore contract for railway track doubling project in Bihar

    Varanasi City Gorakhpur Express to Extend Service Up to Nepalganj Road

    Raipur Railway Division Adds 89 New Platform Shelters Across 12 Stations in Chhattisgarh

    Bhopal Nishatpura Station begins train stoppages to prepare for Simhastha 2028

    Tinsukia Division becomes first in Northeast Frontier Railway to eliminate unmanned crossings

    Mizoram Bairabi-Sairang Rail Line Connects Aizawl to National Network

    RVNL Wins 359 Crore Contract for Railway Line Doubling Project in Bihar

  • Vande Bharat

    Indian Railways Boosts Capacity With New 16 Coach Vande Bharat Trainsets

    Andhra Pradesh gears up for its first Vande Bharat Sleeper train launch by Dussehra

    Indian Railways explains how distributed traction technology powers Vande Bharat performance

    Sabarmati Veraval Vande Bharat Express to follow a new route starting August 17 2026

    Northern and South Western Railways set to receive new Vande Bharat Sleeper trainsets

    Jodhpur prepares to host India first Vande Bharat sleeper maintenance depot

    Bhopal to Lucknow Sleeper Vande Bharat Express to Reduce Travel Time to Eight Hours

    South Eastern Railway proposes new Vande Bharat sleeper trains from Tatanagar

    Indian Railways shifts to internal production as Vande Bharat sleeper train rollout faces delays

No Result
View All Result
HelloRail
  • News
  • Stories

    Dr. Ambedkar Nagar – New Delhi SF Express: Train consistently arrives early at Hazrat Nizamuddin, check details

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

  • Development

    Northeast Railway Boosts Logistics with High Tech Gati Shakti Cargo Terminals

    Indian Railways successfully operates first direct container train to Nepal

    RVNL bags 358 Crore contract for railway track doubling project in Bihar

    Varanasi City Gorakhpur Express to Extend Service Up to Nepalganj Road

    Raipur Railway Division Adds 89 New Platform Shelters Across 12 Stations in Chhattisgarh

    Bhopal Nishatpura Station begins train stoppages to prepare for Simhastha 2028

    Tinsukia Division becomes first in Northeast Frontier Railway to eliminate unmanned crossings

    Mizoram Bairabi-Sairang Rail Line Connects Aizawl to National Network

    RVNL Wins 359 Crore Contract for Railway Line Doubling Project in Bihar

  • Vande Bharat

    Indian Railways Boosts Capacity With New 16 Coach Vande Bharat Trainsets

    Andhra Pradesh gears up for its first Vande Bharat Sleeper train launch by Dussehra

    Indian Railways explains how distributed traction technology powers Vande Bharat performance

    Sabarmati Veraval Vande Bharat Express to follow a new route starting August 17 2026

    Northern and South Western Railways set to receive new Vande Bharat Sleeper trainsets

    Jodhpur prepares to host India first Vande Bharat sleeper maintenance depot

    Bhopal to Lucknow Sleeper Vande Bharat Express to Reduce Travel Time to Eight Hours

    South Eastern Railway proposes new Vande Bharat sleeper trains from Tatanagar

    Indian Railways shifts to internal production as Vande Bharat sleeper train rollout faces delays

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

First ‘Sleeper Vande Bharat Train’ Successfully Completes Trial From Ahmedabad to Mumbai at 130 km/h

Kush Singh by Kush Singh
November 15, 2025
in Vande Bharat
0 0
0
First 'Sleeper Vande Bharat Train' Successfully Completes Trial From Ahmedabad to Mumbai at 130 km/h
Share on FacebookShare on Twitter


What’s inside:

This article talks about the successful trial run of India’s first sleeper Vande Bharat train from Ahmedabad to Mumbai.



India’s first sleeper Vande Bharat train recently completed its trial run from Ahmedabad to Mumbai. The train set off at 9:20 AM and reached Mumbai Central at 1:30 PM, traveling at a speed of 130 km/h.

ADVERTISEMENT

This test run involved stops at stations like Vadodara and Surat, where passengers could catch a glimpse of this new service. The train is designed to cover the distance between Ahmedabad and Mumbai in about five hours.


Passengers can look forward to using this train for their travel needs soon. The sleeper train is expected to make its return journey on November 15 or 16. With its modern amenities, it aims to provide a comfortable travel experience.

ADVERTISEMENT

The train features 16 coaches, including 11 three-tier AC coaches, four two-tier AC coaches, and one first-class AC coach. Various departments have worked together during the trial to ensure safety and functionality.


After this successful trial, the railway authorities will conduct further tests to fine-tune the train’s performance. The next set of tests will take place on November 15 and 16, ensuring everything is ready for regular operations soon.




Summary:

  • First sleeper Vande Bharat train trial was successful.

  • Train traveled from Ahmedabad to Mumbai at 130 km/h.

  • It will return on November 15 or 16.

  • Features 16 modern coaches for passenger comfort.

  • Further tests are planned to ensure safety and efficiency.



Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat