The Pure Shohrat railway crossing in Amethi has been officially closed to all vehicular traffic to facilitate comprehensive track maintenance. This closure, which affects level crossing number 129 located on the Rae Bareli-Ayodhya highway near Nihalgarh Railway Station, will remain in effect until July 31, 2026. The project is being undertaken to ensure the long-term safety and structural integrity of the rail infrastructure in the region.
Key details regarding the closure include:
- Closure Duration: Effective from Thursday until July 31, 2026.
- Location: Level crossing number 129, near Nihalgarh Railway Station.
- Reason: Essential and critical railway track repair work.
- Impact: Commuters must use the Rae Bareli-Ayodhya highway bypass and the Badagaon railway crossing for travel.
Operational Concerns and Local Impact
While the maintenance work is necessary for railway safety, the project has attracted attention due to reports claiming that the work commenced without securing a formal “track block,” a mandatory safety protocol for railway engineering operations. Railway authorities are currently overseeing the site to ensure that the work proceeds under strict safety guidelines despite the initial procedural questions.
For local residents and daily commuters, the closure has caused significant logistical challenges. The shutdown of this key transit point has forced travelers to take detours spanning five to eight kilometers. This change has disrupted daily routines, particularly for those traveling to local markets, agricultural fields, and schools. Furthermore, the extended travel distance has led to increased fuel consumption, placing an additional financial burden on the local population. Residents are encouraged to plan their daily trips in advance and utilize the designated alternative routes via the highway bypass or the Badagaon crossing to avoid unnecessary delays.



























