• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Thursday, April 2, 2026
HelloRail
  • News
  • Stories

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

    Etihad Rail Runs Special Trains: Free Ride for Stranded Residents from Saudi Border to Abu Dhabi

    South Bihar Express Passenger Gives Birth to Baby Girl at Jhajha Railway Station

    The Free Train Of India. Bhakra Nangal Train Will Take You From Punjab to Himachal via Mountains.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

  • Development

    Koilwar to get India’s second four-lane railway bridge to end train delays in Bihar

    Delhi Railway Update: New tracks between Tilak Bridge and Anand Vihar to reduce 76 percent traffic load

    Patna Metro Work Resumes Under Rajendra Nagar Terminal, Trains to Run on Top and Metro Below

    Rishikesh-Karnaprayag Railway: Srinagar’s Bilv Kedar to become a major spiritual-economic hub

    India’s Second Four-Lane Rail Bridge to be Built in Koilwar Bihar: Proposal Sent to Railway Board

    Indian Railways Special Trains: New Delhi to Howrah and Bhagalpur Routes Open for Summer Travel

    Eastern Railway Update: 24 new trains launched and speed increased to 130 kmph for 32 trains

    Badi Sadri-Neemuch Rail Project: Successful 110 KMPH speed trial marks major milestone

    Indian Railways update: Highest ever freight loading of 1,670 million tonnes recorded in FY 2025-26

  • Vande Bharat

    Vande Bharat Express: Loco pilot slows down train after passenger pleads with folded hands

    Vande Bharat Express: RCF Kapurthala rolls out its first 16-coach train set, operations to start soon

    Indian Railways Train Speed Update: Vande Bharat and Gatimaan Speed Limited to 130 kmph on Specific Routes

    Patna-Lucknow Vande Bharat Express: Check route timings and Ayodhya Dham Junction arrival

    Vande Bharat Cargo Train: Trial runs to begin from April 4 on Delhi-Mumbai route

    Jodhpur-Sabarmati Vande Bharat: Route changed for 4 trains due to signaling work, check details

    Jodhpur-Delhi Vande Bharat Express: New stoppage at Gandhinagar Jaipur Station from March 29, check timings

    Vande Bharat Express: New route approved between Patna and Gorakhpur with stop at Gopalganj

    Vande Bharat Express accident at Badh Railway Station: Mute and deaf man killed on platform

No Result
View All Result
HelloRail
  • News
  • Stories

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

    Etihad Rail Runs Special Trains: Free Ride for Stranded Residents from Saudi Border to Abu Dhabi

    South Bihar Express Passenger Gives Birth to Baby Girl at Jhajha Railway Station

    The Free Train Of India. Bhakra Nangal Train Will Take You From Punjab to Himachal via Mountains.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

  • Development

    Koilwar to get India’s second four-lane railway bridge to end train delays in Bihar

    Delhi Railway Update: New tracks between Tilak Bridge and Anand Vihar to reduce 76 percent traffic load

    Patna Metro Work Resumes Under Rajendra Nagar Terminal, Trains to Run on Top and Metro Below

    Rishikesh-Karnaprayag Railway: Srinagar’s Bilv Kedar to become a major spiritual-economic hub

    India’s Second Four-Lane Rail Bridge to be Built in Koilwar Bihar: Proposal Sent to Railway Board

    Indian Railways Special Trains: New Delhi to Howrah and Bhagalpur Routes Open for Summer Travel

    Eastern Railway Update: 24 new trains launched and speed increased to 130 kmph for 32 trains

    Badi Sadri-Neemuch Rail Project: Successful 110 KMPH speed trial marks major milestone

    Indian Railways update: Highest ever freight loading of 1,670 million tonnes recorded in FY 2025-26

  • Vande Bharat

    Vande Bharat Express: Loco pilot slows down train after passenger pleads with folded hands

    Vande Bharat Express: RCF Kapurthala rolls out its first 16-coach train set, operations to start soon

    Indian Railways Train Speed Update: Vande Bharat and Gatimaan Speed Limited to 130 kmph on Specific Routes

    Patna-Lucknow Vande Bharat Express: Check route timings and Ayodhya Dham Junction arrival

    Vande Bharat Cargo Train: Trial runs to begin from April 4 on Delhi-Mumbai route

    Jodhpur-Sabarmati Vande Bharat: Route changed for 4 trains due to signaling work, check details

    Jodhpur-Delhi Vande Bharat Express: New stoppage at Gandhinagar Jaipur Station from March 29, check timings

    Vande Bharat Express: New route approved between Patna and Gorakhpur with stop at Gopalganj

    Vande Bharat Express accident at Badh Railway Station: Mute and deaf man killed on platform

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Patna Metro Work Resumes Under Rajendra Nagar Terminal, Trains to Run on Top and Metro Below

Kush Singh by Kush Singh
April 2, 2026
in Development
0 0
0
Share on FacebookShare on Twitter

Tunneling work for Patna Metro Corridor-2 has officially resumed between Moinul Haque Stadium and Rajendra Nagar Terminal. The project was on hold since December 2025 because it needed a No Objection Certificate from Indian Railways. Following discussions between engineers and railway officials, excavation started again around March 12, 2026. This underground section is a critical part of the city transport network that aims to reduce traffic congestion.

ADVERTISEMENT

🚨: Rishikesh-Karnaprayag Railway: Srinagar’s Bilv Kedar to become a major spiritual-economic hub।

Why was the Patna Metro work halted and what changed now?

The construction was stopped because the metro line passes directly under the busy Patna-Howrah main line at Rajendra Nagar Terminal. Indian Railways required a No Objection Certificate (NOC) to ensure the tunnel would not interfere with any future expansion of the terminal infrastructure. In early March 2026, the railways granted the necessary clearance after reviewing the alignment and safety plans. Larsen and Toubro is currently managing the design and construction of this underground stretch under the supervision of the Delhi Metro Rail Corporation.

ADVERTISEMENT

Key features of the Rajendra Nagar underground metro station

The Rajendra Nagar station is designed to be a dual connectivity hub for the city. It allows passengers to switch easily between the Indian Railways network and the metro system. Safety regulations require a specific gap between the active rail lines and the metro tunnel to maintain structural integrity.

  • The station is being built 21 meters below the ground level.
  • A soil cushion of at least 15 meters is maintained between the railway tracks and the metro tunnel.
  • Modern Tunnel Boring Machines are used to ensure safe excavation without disturbing train movements above.
  • The Rajendra Nagar station is projected to be one of the deepest metro stations in the country.

Project costs and completion timelines for Patna Metro

The overall Patna Metro project involves significant investment from the state government and international agencies. The underground section of Corridor-2 is expected to be ready for use by the end of 2026.

Project Detail Estimated Value or Date
Total Project Cost ₹13,365.77 crore
Underground Section Completion End of 2026
L&T Corridor-2 Contract ₹1,989 crore
JICA Loan for Financing ₹5,520.93 crore
Priority Segment Operations October 2025
Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat