Modern Train Initiatives
In the general budget, there is a significant focus on the introduction of modern trains such as Vande Bharat Sleeper, Vande Metro, and Bullet Trains within the Railways. This initiative aims to facilitate the operation of Vande Bharat trains on routes connecting Tatanagar to Varanasi and Bilaspur. Additionally, the budget emphasizes enhancing safety measures on the Howrah-Mumbai rail route by implementing an automatic train protection (ATP) system known as Kavach, designed to mitigate the risk of railway accidents. Funds have been allocated specifically for these advancements.
Infrastructure Development and Safety Enhancements
The budget also prioritizes infrastructure improvements, which include the installation of excessive equipment and the laying of new railway lines to ensure safe operations. An auto signal system is set to be installed from Tata to Kharagpur, and changes in train operations from Rajkarsawan to Rajkarsawan within the Chakradharpur division are being planned. Furthermore, financial provisions have been made for the construction of a fourth line in the Chakradharpur division, aimed at enhancing the operation of passenger trains. Increased allocations for yard expansion, station development, and safety systems have been noted, particularly benefiting the southeast zone, which is expected to receive more than 5000 crores for development in the Chakradharpur and Ranchi divisions of Jharkhand.
Future Plans and Expectations
The budget outlines plans for the doubling of the Kandra-Nakum railroad and the Ilu-Silli Line, alongside the Tata-Badampahar rail route, with work on these projects expected to commence soon. Development plans are anticipated to receive funding, following prior surveys. Additionally, an initiative to replace old tracks is expected to be announced in order to enhance train speeds. The Railways will also begin installing an armor system across its entire network to further prevent accidents. Plans to increase the number of Amrit Bharat stations in the Chakradharpur division and to develop numerous locations along the Howrah-Mumbai route have also been included in the budget. However, railway officials have stated that they cannot provide further details until the pink book is released.
Important Information Organised For You.
Category | Details |
---|---|
Modern Trains |
Inclusion of Vande Bharat Sleeper, Vande Metro, and Bullet Trains. |
Routes for Vande Bharat |
Tatanagar to Varanasi and Bilaspur routes. |
Safety Measures |
Implementation of automatic train protection (ATP) system called Kavach on Howrah-Mumbai route. |
Infrastructure Development |
Installation of excessive equipment, new line laying, and auto signal system from Tata to Kharagpur. |
Chakradharpur Division Changes |
Change in train operations from Rajkarsawan to Rajkarsawan and allocation for fourth line. |
Funding Allocation |
Over 5000 crores expected for development in Chakradharpur and Ranchi divisions of Jharkhand. |
New Developments |
Survey for new rail routes, foot overbridge, over bridge, subway, and doubling of Kandra-Nakum railroad and Ilu-Silli Line. |
Speed Enhancement |
Announcement for changing the second old track to increase train speed. |
Armor System |
Installation of armor system on entire track to prevent accidents. |
Amrit Bharat Stations |
Increase in number of Amrit Bharat stations in Chakradharpur division. |
Budget Expectations |
High expectations from passengers of Tatanagar and Chakradharpur divisions. |