• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Saturday, May 16, 2026
HelloRail
  • News
  • Stories

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

    Etihad Rail Runs Special Trains: Free Ride for Stranded Residents from Saudi Border to Abu Dhabi

    South Bihar Express Passenger Gives Birth to Baby Girl at Jhajha Railway Station

    The Free Train Of India. Bhakra Nangal Train Will Take You From Punjab to Himachal via Mountains.

  • Development

    Haridwar-Dehradun Rail Line: Second track to be laid through Rajaji Tiger Reserve

    Amethi Railway Station: Redevelopment work under Amrit Bharat Scheme to give station a new look

    RailOne App: Indian Railways introduces AI feature to predict waiting list confirmation chances

    Ravi River Bridge: Northern Railway completes reconstruction of Bridge No. 17 in record time

    Rajasthan Infrastructure: Development projects worth ₹400 crore launched by Union and State Ministers

    Gorakhpur Junction Mega Upgrade: 11 platforms and 10 mini bridges to be built

    Baghha Railway Crossing 50-C: Technical glitch causes traffic jam and commuters face heat

    Bag Express Update: Modern LHB coaches to be introduced on Howrah-Kathgodam route

    Railway bridge project: New advanced bridge to be built over Ganga river at Brajghat

  • Vande Bharat

    Patna-Howrah Vande Bharat Express: New stoppage at Jamui station announced, check timings

    Patna-Howrah Vande Bharat Express: Stop started at Jamui railway station, check timings

    Vande Bharat Express: Train halted for 75 minutes in Pratapgarh due to fallen tree

    Jammu-Srinagar Vande Bharat Express: Over 45,000 passengers travel in first 10 days

    New Train Announcement: Indian Railways to launch superfast service between Bengaluru and Mumbai

    Patliputra Vande Bharat Express: Low occupancy and high fares lead to poor passenger turnout

    Vande Bharat Express: New sleeper train planned between Delhi and Howrah via Patna, check details

    Vande Metro Update: Indian Railways to replace local trains with Namo Bharat Rapid Rail on key routes

    New Vande Bharat Express: First trainset from MCF Raebareli departs for Delhi-Howrah route trials

No Result
View All Result
HelloRail
  • News
  • Stories

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

    Etihad Rail Runs Special Trains: Free Ride for Stranded Residents from Saudi Border to Abu Dhabi

    South Bihar Express Passenger Gives Birth to Baby Girl at Jhajha Railway Station

    The Free Train Of India. Bhakra Nangal Train Will Take You From Punjab to Himachal via Mountains.

  • Development

    Haridwar-Dehradun Rail Line: Second track to be laid through Rajaji Tiger Reserve

    Amethi Railway Station: Redevelopment work under Amrit Bharat Scheme to give station a new look

    RailOne App: Indian Railways introduces AI feature to predict waiting list confirmation chances

    Ravi River Bridge: Northern Railway completes reconstruction of Bridge No. 17 in record time

    Rajasthan Infrastructure: Development projects worth ₹400 crore launched by Union and State Ministers

    Gorakhpur Junction Mega Upgrade: 11 platforms and 10 mini bridges to be built

    Baghha Railway Crossing 50-C: Technical glitch causes traffic jam and commuters face heat

    Bag Express Update: Modern LHB coaches to be introduced on Howrah-Kathgodam route

    Railway bridge project: New advanced bridge to be built over Ganga river at Brajghat

  • Vande Bharat

    Patna-Howrah Vande Bharat Express: New stoppage at Jamui station announced, check timings

    Patna-Howrah Vande Bharat Express: Stop started at Jamui railway station, check timings

    Vande Bharat Express: Train halted for 75 minutes in Pratapgarh due to fallen tree

    Jammu-Srinagar Vande Bharat Express: Over 45,000 passengers travel in first 10 days

    New Train Announcement: Indian Railways to launch superfast service between Bengaluru and Mumbai

    Patliputra Vande Bharat Express: Low occupancy and high fares lead to poor passenger turnout

    Vande Bharat Express: New sleeper train planned between Delhi and Howrah via Patna, check details

    Vande Metro Update: Indian Railways to replace local trains with Namo Bharat Rapid Rail on key routes

    New Vande Bharat Express: First trainset from MCF Raebareli departs for Delhi-Howrah route trials

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Train Delay: Odisha Consumer Court orders Indian Railways to pay ₹1.30 lakh compensation to passenger

Kush Singh by Kush Singh
May 3, 2026
in Important, News
0 0
0
Share on FacebookShare on Twitter

An Odisha consumer court has ordered Indian Railways to pay ₹1.30 lakh to a passenger named Chandi Prasad Khamari. The man missed his flight to Guwahati because his train arrived several hours late in Kolkata. The court ruled that railway delays without extraordinary reasons are not acceptable and the department must compensate passengers for their loss.

ADVERTISEMENT

👉: Sumerpur Banda Road: Railway Gate No. 31 to get new overbridge to end traffic jams।

How did the passenger miss his flight?

In August 2024, Chandi Prasad Khamari travelled from Jharsuguda to Howrah on Train No. 12129. The train was scheduled to reach Kolkata at 3:55 AM, and he had a connecting flight at 8:05 AM. However, the train started two hours late and reached Kolkata nearly seven hours behind schedule, causing him to miss his flight.

ADVERTISEMENT

Why did the penalty increase to ₹1.30 lakh?

The court initially ordered a compensation of ₹55,000, which included ₹20,000 for flight losses, ₹30,000 for mental agony, and ₹5,000 for legal costs. Because Indian Railways did not pay this amount within 30 days, a daily penalty of ₹500 was added for over 200 days, bringing the total amount to ₹1.30 lakh.

What was the court’s decision on railway arguments?

Indian Railways argued that punctuality is not guaranteed and delays happen due to operational reasons. The court rejected this, stating that routine maintenance is a normal responsibility and not an excuse. The forum held that as a public utility, the railways are accountable for delays unless they can prove an extraordinary circumstance.

Frequently Asked Questions (FAQs)

Why was the passenger awarded compensation?

Chandi Prasad Khamari missed his flight from Kolkata to Guwahati because Train No. 12129 arrived 7 hours late, causing financial loss and mental distress.

What was the final amount paid by Indian Railways?

The total amount was ₹1.30 lakh, which included the original ₹55,000 compensation plus a daily penalty of ₹500 for delaying the payment for over 200 days.

{“@context”: “https://schema.org”, “@type”: “FAQPage”, “mainEntity”: [{“@type”: “Question”, “name”: “Why was the passenger awarded compensation?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “Chandi Prasad Khamari missed his flight from Kolkata to Guwahati because Train No. 12129 arrived 7 hours late, causing financial loss and mental distress.”}}, {“@type”: “Question”, “name”: “What was the final amount paid by Indian Railways?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “The total amount was ₹1.30 lakh, which included the original ₹55,000 compensation plus a daily penalty of ₹500 for delaying the payment for over 200 days.”}}]}

Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat