North Western Railway has announced the partial cancellation of Jodhpur-Bilara-Jodhpur passenger train services. This decision follows the extension of construction work for Road Under Bridges (RUB) at level crossing gates on the Pipar Road-Bilara section. The move will affect daily commuters traveling between these stations until December 2026.
ℹ️: Railway safety boost: Kavach 4.0 system operational on Delhi-Palwal route।
Which trains are affected and what is the new route?
The railway administration has modified the operational route for two specific train numbers to facilitate infrastructure work. The details are as follows:
| Train Number | Route Change | Effective Date |
|---|---|---|
| 54825 (Jodhpur-Bilara) | Will run from Jodhpur to Pipar Road only | 19 May 2026 to 18 Dec 2026 |
| 54826 (Bilara-Jodhpur) | Will start from Pipar Road instead of Bilara | 20 May 2026 to 19 Dec 2026 |
How many trips are cancelled and why?
A total of 428 trips will be partially cancelled in both directions, meaning 214 trips each way. According to DRM Anurag Tripathi, this is necessary because of the RUB construction between Pipar Road and Bilara. Chief Public Relations Officer Amit Sudarshan stated that these changes ensure the technical work is completed safely and within the set timeline to improve basic infrastructure.
Frequently Asked Questions (FAQs)
जोधपुर-बिलाड़ा पैसेंजर ट्रेन कब तक आंशिक रूप से रद्द रहेगी?
यह सेवा 19 मई 2026 से 19 दिसंबर 2026 तक आंशिक रूप से रद्द रहेगी, जिससे ट्रेन केवल पीपाड़ रोड तक ही संचालित होगी।
ट्रेन के रूट में बदलाव का मुख्य कारण क्या है?
पीपाड़ रोड और बिलाड़ा रेलखंड के समपार फाटकों पर रोड अंडर ब्रिज (RUB) का निर्माण कार्य चलने के कारण यह फैसला लिया गया है।



























