Chhattisgarh Chief Minister Vishnu Deo Sai inaugurated the Kachna Railway Overbridge in Raipur on May 22, 2026. This project comes after an eight-year wait and aims to solve the long-standing problem of heavy traffic jams at the Kachna railway crossing. Along with the bridge, the widening of the Shankar Nagar-Khamhardih-Kachna road, built at a cost of 22.79 crore rupees, was also opened for the public.
What are the key features of the Kachna Railway Overbridge?
The overbridge was constructed with a budget of 48.78 crore rupees. It is approximately 787 to 871 meters long and 12 to 13 meters wide. To ensure safety and ease of travel, the Public Works Department (PWD) has equipped the bridge with service lanes, proper road markings, reflective sign boards, and modern lighting for night travel.
How will this project benefit the local people?
The bridge will provide a huge relief to over 2 lakh people daily. Previously, about 120 passenger and goods trains passed through the Kachna crossing every day, causing the gates to close every 15 minutes. This project will now provide seamless connectivity to several areas including Shankar Nagar, VIP Colony, Khamhardih, and Kachna. It will also benefit drivers traveling towards Bilaspur and Baloda Bazar.
| Feature | Details |
|---|---|
| Project Cost | 48.78 Crore Rupees |
| Bridge Length | 787 – 871 Meters |
| Bridge Width | 12 – 13 Meters |
| Daily Beneficiaries | Over 2 Lakh People |
| Connected Areas | Kachna, Khamhardih, Shankar Nagar, and others |
| Funding Source | Central Road Fund Scheme |
Frequently Asked Questions (FAQs)
कचना रेलवे ओवरब्रिज की कुल लागत कितनी है?
इस ओवरब्रिज के निर्माण पर कुल 48.78 करोड़ रुपये खर्च किए गए हैं।
इस ओवरब्रिज से किन इलाकों को फायदा होगा?
इससे शंकरनगर, खम्हारडीह, कचना, वीआईपी कॉलोनी और आसपास की करीब 25 कॉलोनियों के लोगों को ट्रैफिक से राहत मिलेगी।



























