• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Sunday, April 5, 2026
HelloRail
  • News
  • Stories

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

    Etihad Rail Runs Special Trains: Free Ride for Stranded Residents from Saudi Border to Abu Dhabi

    South Bihar Express Passenger Gives Birth to Baby Girl at Jhajha Railway Station

    The Free Train Of India. Bhakra Nangal Train Will Take You From Punjab to Himachal via Mountains.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

  • Development

    Indian Railways to install AI sensor cameras for X-ray inspection of train joints in Uttar Pradesh

    Sarai Kale Khan Multi-Modal Transport Hub: 31-Acre Mega Project to Integrate RRTS Metro and ISBT

    Muzaffarpur-Darbhanga New Rail Line: ₹511 Crore Allocated to Cut Travel Time by Half

    Nawada-Laxmipur Rail Line Project: Approved budget of Rs 621 crore for 137 km new track in Bihar

    Delhi Metro Phase 5: High-Tech Central Vista Depot Near Majlis Park to Boost Network Operations

    Delhi to Sitamarhi Special Summer Trains: Northern Railway Announces 28 Trips Starting April 16

    DMRC Floats Tender for Central Vista Depot Design to Speed Up Metro Phase 5A

    Amrit Bharat Station Scheme: Major inspection of Moradabad-Dhampur section completed, check latest updates on passenger facilities

    Sarai Kale Khan Multi-Modal Hub Operational, Delhi to Get 14,000 Electric Buses by 2029

  • Vande Bharat

    ECR Achievement: Record revenue of ₹30,330 crore and 45 new trains launched in FY 2025-26

    Vande Bharat Express: New route announced between Amritsar and Katra, check timings

    North Western Railway sets new record with ₹8622 crore revenue and 792 special trains

    Vande Bharat Express: Loco pilot slows down train after passenger pleads with folded hands

    Vande Bharat Express: RCF Kapurthala rolls out its first 16-coach train set, operations to start soon

    Indian Railways Train Speed Update: Vande Bharat and Gatimaan Speed Limited to 130 kmph on Specific Routes

    Patna-Lucknow Vande Bharat Express: Check route timings and Ayodhya Dham Junction arrival

    Vande Bharat Cargo Train: Trial runs to begin from April 4 on Delhi-Mumbai route

    Jodhpur-Sabarmati Vande Bharat: Route changed for 4 trains due to signaling work, check details

No Result
View All Result
HelloRail
  • News
  • Stories

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

    Etihad Rail Runs Special Trains: Free Ride for Stranded Residents from Saudi Border to Abu Dhabi

    South Bihar Express Passenger Gives Birth to Baby Girl at Jhajha Railway Station

    The Free Train Of India. Bhakra Nangal Train Will Take You From Punjab to Himachal via Mountains.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

    Railway Reveals Shocking Truth About Linen Washing Frequency for Passengers in AC Coaches.

  • Development

    Indian Railways to install AI sensor cameras for X-ray inspection of train joints in Uttar Pradesh

    Sarai Kale Khan Multi-Modal Transport Hub: 31-Acre Mega Project to Integrate RRTS Metro and ISBT

    Muzaffarpur-Darbhanga New Rail Line: ₹511 Crore Allocated to Cut Travel Time by Half

    Nawada-Laxmipur Rail Line Project: Approved budget of Rs 621 crore for 137 km new track in Bihar

    Delhi Metro Phase 5: High-Tech Central Vista Depot Near Majlis Park to Boost Network Operations

    Delhi to Sitamarhi Special Summer Trains: Northern Railway Announces 28 Trips Starting April 16

    DMRC Floats Tender for Central Vista Depot Design to Speed Up Metro Phase 5A

    Amrit Bharat Station Scheme: Major inspection of Moradabad-Dhampur section completed, check latest updates on passenger facilities

    Sarai Kale Khan Multi-Modal Hub Operational, Delhi to Get 14,000 Electric Buses by 2029

  • Vande Bharat

    ECR Achievement: Record revenue of ₹30,330 crore and 45 new trains launched in FY 2025-26

    Vande Bharat Express: New route announced between Amritsar and Katra, check timings

    North Western Railway sets new record with ₹8622 crore revenue and 792 special trains

    Vande Bharat Express: Loco pilot slows down train after passenger pleads with folded hands

    Vande Bharat Express: RCF Kapurthala rolls out its first 16-coach train set, operations to start soon

    Indian Railways Train Speed Update: Vande Bharat and Gatimaan Speed Limited to 130 kmph on Specific Routes

    Patna-Lucknow Vande Bharat Express: Check route timings and Ayodhya Dham Junction arrival

    Vande Bharat Cargo Train: Trial runs to begin from April 4 on Delhi-Mumbai route

    Jodhpur-Sabarmati Vande Bharat: Route changed for 4 trains due to signaling work, check details

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

IRCTC Update: New rules for train reservation chart preparation time effective soon

Kush Singh by Kush Singh
April 4, 2026
in Important, News
0 0
0
Share on FacebookShare on Twitter

The Indian Railways has revised the timing for preparing the first reservation chart to improve passenger convenience and transparency. Instead of the traditional four-hour window, charts will now be ready 9 to 18 hours before a train leaves its starting station. This change helps travelers check their ticket status much earlier and plan their journeys with more certainty without waiting for the last moment.

ADVERTISEMENT

Revised Chart Preparation Schedule

The Railway Board has defined specific windows for chart preparation based on the departure time of the train. This systematic approach ensures that passengers have ample time to verify their seat or berth status.

  • For trains departing between 5:01 AM and 2:00 PM, the first reservation chart will be prepared by 8:00 PM on the previous day.
  • For trains departing between 2:01 PM and 11:59 PM, the chart will be prepared at least 10 hours in advance.
  • For trains departing between 12:00 AM and 5:00 AM, the first reservation chart will also be ready at least 10 hours before departure.

Key Benefits and Added Facilities for Passengers

This policy change is designed to reduce passenger anxiety and curb the activities of illegal ticket agents. Passengers now have more flexibility regarding their travel plans and seat upgrades.

ADVERTISEMENT
  • Waitlisted and RAC ticket holders will receive timely confirmation of their status for better planning.
  • Passengers can change their boarding station up to 30 minutes before the train departure.
  • Travel class upgrades are available up to 30 minutes before departure if seats are vacant.
  • Refund rules have been updated to provide easier cancellations for e-ticket holders without the need for a TDR in certain cases.
Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat