The South East Central Railway (SECR) Bilaspur zone has announced a major rail block on the Bilaspur-Raipur route from May 3, 2026, to May 22, 2026. This decision will lead to the cancellation of several trains and changes in routes to allow for essential infrastructure work. Passengers traveling through Chhattisgarh and neighboring regions will be affected by these changes.
Which trains are affected and why
The disruptions are caused by two main projects. Maintenance work on Platform Number 4 at Gondia station in the Nagpur division will close the down main line for about 20 days to replace the washable apron with a ballasted track. Additionally, a road underbridge is being constructed in the Nipania-Bhatapara section of the Raipur division. These works aim to improve train speed and safety.
| Impact Category | Number of Trains |
|---|---|
| Cancelled Trains | 18 (10 Express, 8 Passenger) |
| Short Terminated | 20 |
| Route Diverted | 2 |
Route changes and affected areas
The rail block will impact travel across Bilaspur, Raipur, Nagpur, Raigarh, Korba, Gevra Road, Tatanagar, Itwari, Balaghat, and Durg. Specifically, the Barauni-Gondia Express will only run up to Durg from May 2 to May 22, 2026. The Rewa-Itwari Express (11754) and Itwari-Rewa Express (11753) will be diverted via Jabalpur-Nainpur-Chhindwara-Itwari instead of the usual Balaghat and Gondia route.
How to check your train status
Railway authorities have asked passengers to verify their train status before starting their journey to avoid inconvenience. You can check the live status on the official website www.enquiry.indianrail.gov.in or by calling the railway helpline number 139.
Frequently Asked Questions (FAQs)
बिलासपुर-रायपुर रूट पर ट्रेनें क्यों कैंसिल की गई हैं?
गोंदिया स्टेशन पर प्लेटफॉर्म नंबर 4 के मेंटेनेंस और निपानिया-भाटापारा सेक्शन में रोड अंडरब्रिज के निर्माण के कारण यह ब्लॉक लिया गया है।
यह रेल ब्लॉक कब से कब तक रहेगा?
यह ब्लॉक 3 मई 2026 से शुरू होकर 22 मई 2026 तक चलेगा।
{“@context”: “https://schema.org”, “@type”: “FAQPage”, “mainEntity”: [{“@type”: “Question”, “name”: “बिलासपुर-रायपुर रूट पर ट्रेनें क्यों कैंसिल की गई हैं?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “गोंदिया स्टेशन पर प्लेटफॉर्म नंबर 4 के मेंटेनेंस और निपानिया-भाटापारा सेक्शन में रोड अंडरब्रिज के निर्माण के कारण यह ब्लॉक लिया गया है।”}}, {“@type”: “Question”, “name”: “यह रेल ब्लॉक कब से कब तक रहेगा?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “यह ब्लॉक 3 मई 2026 से शुरू होकर 22 मई 2026 तक चलेगा।”}}]}


























