The Northeast Frontier Railway (NFR) has introduced the first MEMU train service in the Northeast region. This new electric service connects Agartala and Karimganj, covering a distance of 205 km. The train was flagged off by Tripura Chief Minister Dr. Manik Saha on July 4, 2026, and regular commercial operations started on July 6, 2026.
📰: Railway Track Crossing: New rules and fines for crossing tracks to change platforms।
What are the timings and route details
The service operates six days a week, except on Sundays. The train stops at 23 intermediate stations to help local passengers. The travel time for the journey is approximately 6 hours and 30 minutes.
| Train Number | Route | Departure | Arrival |
|---|---|---|---|
| 75679 | Agartala to Karimganj | 07:20 am | 01:50 pm |
| 75680 | Karimganj to Agartala | 02:25 pm | 08:40 pm |
What are the features and benefits of the new MEMU train
This service replaces the old Diesel (DEMU) trains after the electrification of the line. The MEMU trains offer faster acceleration, smoother rides, and zero emissions at the point of operation. The train consists of 12 modern coaches and can carry between 3,000 to 4,000 passengers.
- LED lighting and stainless steel coaches
- Bio-toilets and CCTV surveillance
- GPS-based passenger information and public address system
- Lower noise levels and reduced maintenance requirements
Frequently Asked Questions (FAQs)
What is the travel time between Agartala and Karimganj by MEMU?
The train covers the 205 km distance in approximately 6 hours and 30 minutes, stopping at 23 stations.
On which days does the Agartala-Karimganj MEMU train operate?
The train operates six days a week and does not run on Sundays.



























