• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Saturday, June 20, 2026
HelloRail
  • News
  • Stories

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

    Etihad Rail Runs Special Trains: Free Ride for Stranded Residents from Saudi Border to Abu Dhabi

  • Development

    Seemanchal Rail Project: Double line approved for Katihar section, trains to run at 110 km/h

    West Bengal Railway Update: PM Modi inaugurates Sankrail-Santragachi link line and new ROB project

    New Train Announcement: Indian Railways to launch Amrit Bharat Express between Jaipur and Darbhanga

    Bihar Railway Update: Marhaura Engine Factory contributes ₹1000 crore GST, projects worth ₹1.15 lakh crore underway

    West Bengal Infrastructure: Road Over Bridge to be built between Howrah and Radhamohanpur

    Sankrail-Santragachi Link Line: PM Modi dedicates 9 km rail project to nation in West Bengal

    Howrah Railway Hospital: PM Modi lays foundation stone for new 300-bed facility

    NCR Cleanliness Drive: ₹28 crore to be spent for waste management at 39 stations

    Odisha Railway Update: PM Modi launches multi-tracking projects worth 732 crore

  • Vande Bharat

    Vande Bharat Express: New route approved between Udaipur and New Delhi, check timings

    Sabarmati-Veraval Vande Bharat Express: New route via Botad announced, check new timings

    Amritsar-Katra Vande Bharat Express: New route via Gurdaspur announced, check timings

    Vande Bharat Update: Indian Railways to introduce 220 km/h speed and black box technology

    Amritsar-Katra Vande Bharat Express: New route via Gurdaspur operational, check travel time

    Vande Bharat Express: High-tech maintenance depot being built in Bilaspur, completion target by August

    Vande Bharat Express: Free meals for passengers if train is delayed by more than 2 hours

    Indian Railways to replace pantry cars with new Hot Buffet Coaches for high-speed trains

    New Vande Bharat Express: Indian Railways to launch service between Mathura and Ayodhya

No Result
View All Result
HelloRail
  • News
  • Stories

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

    Etihad Rail Runs Special Trains: Free Ride for Stranded Residents from Saudi Border to Abu Dhabi

  • Development

    Seemanchal Rail Project: Double line approved for Katihar section, trains to run at 110 km/h

    West Bengal Railway Update: PM Modi inaugurates Sankrail-Santragachi link line and new ROB project

    New Train Announcement: Indian Railways to launch Amrit Bharat Express between Jaipur and Darbhanga

    Bihar Railway Update: Marhaura Engine Factory contributes ₹1000 crore GST, projects worth ₹1.15 lakh crore underway

    West Bengal Infrastructure: Road Over Bridge to be built between Howrah and Radhamohanpur

    Sankrail-Santragachi Link Line: PM Modi dedicates 9 km rail project to nation in West Bengal

    Howrah Railway Hospital: PM Modi lays foundation stone for new 300-bed facility

    NCR Cleanliness Drive: ₹28 crore to be spent for waste management at 39 stations

    Odisha Railway Update: PM Modi launches multi-tracking projects worth 732 crore

  • Vande Bharat

    Vande Bharat Express: New route approved between Udaipur and New Delhi, check timings

    Sabarmati-Veraval Vande Bharat Express: New route via Botad announced, check new timings

    Amritsar-Katra Vande Bharat Express: New route via Gurdaspur announced, check timings

    Vande Bharat Update: Indian Railways to introduce 220 km/h speed and black box technology

    Amritsar-Katra Vande Bharat Express: New route via Gurdaspur operational, check travel time

    Vande Bharat Express: High-tech maintenance depot being built in Bilaspur, completion target by August

    Vande Bharat Express: Free meals for passengers if train is delayed by more than 2 hours

    Indian Railways to replace pantry cars with new Hot Buffet Coaches for high-speed trains

    New Vande Bharat Express: Indian Railways to launch service between Mathura and Ayodhya

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Bihar Railway Update: Marhaura Engine Factory contributes ₹1000 crore GST, projects worth ₹1.15 lakh crore underway

Kush Singh by Kush Singh
June 20, 2026
in Development, News
0 0
0
Share on FacebookShare on Twitter

Union Railway Minister Ashwini Vaishnaw visited Bihar on June 19, 2026, and shared major updates on the state’s rail infrastructure. He announced that the Marhaura Rail Engine Factory has contributed approximately ₹1000 crore as GST revenue to Bihar. Currently, railway projects worth ₹1.15 lakh crore are being implemented across the state to improve connectivity.

ADVERTISEMENT

🗞️: West Bengal Infrastructure: Road Over Bridge to be built between Howrah and Radhamohanpur।

What are the new train services and infrastructure updates in Bihar?

The Railway Minister flagged off several new services including the Chapra–Delhi (Anand Vihar) Express and Mau–Delhi (Anand Vihar) Express. Additionally, the Dohrighat–Aunrihar MEMU service was extended to Varanasi. To handle more passengers, five new platforms are being built at Patna Junction, and Fatuha station is also being upgraded.

ADVERTISEMENT

What are the details of locomotive exports and future high-speed rail?

The Marhaura plant is now exporting locomotives globally. A deal for 140 locomotives worth ₹3,000 crore was finalized with Guinea, and the 51st engine is set for export to the African nation. Regarding future travel, a bullet train corridor from Delhi to Patna is proposed, which will reduce travel time to 4 hours and 41 minutes, with a further extension planned to Siliguri.

How has the railway budget and fleet for Bihar changed?

Detail Information
Current Financial Year Allocation Over ₹10,000 crore
Pre-2014 Budget ₹1,000 crore
Vande Bharat Trains Received 14 trains
Amrit Bharat Trains Received 11 trains
Total Project Value in Bihar ₹1.15 lakh crore

Frequently Asked Questions (FAQs)

How much GST revenue did Bihar receive from the Marhaura Rail Engine Factory?

Bihar has received approximately ₹1000 crore as GST revenue from the Marhaura Rail Engine Factory to date.

What is the proposed travel time for the Delhi-Patna bullet train?

The proposed bullet train corridor from Delhi to Patna is expected to reduce the travel time to 4 hours and 41 minutes.

Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat