Heavy rainfall and strong winds caused major disruptions in the Dhanbad Rail Division on Friday, May 29, 2026. The rain made the tracks in the Gurpa-Gajhandi ghat section very slippery, leading to engine failures. This caused several trains to get stuck or delayed, affecting thousands of passengers.
🚨: Railway Ticket Upgrade: How to travel in AC coach with a Sleeper class ticket।
Which trains were affected by the track slipperiness?
The disruption started around 8:20 AM when the Duronto Express engine failed near the Baskatwa home signal between Gurpa and Dilwa stations. Soon after, a loaded freight train also faced engine failure at the same location. This led to a chain reaction that delayed other major trains.
| Train Name | Status |
|---|---|
| Duronto Express | Engine Failed |
| Loaded Freight Train | Engine Failed |
| Ajmer-Sealdah Express | Halted |
| Patna-Ranchi Janshatabdi Express | Stopped |
| Vande Bharat Express | Delayed |
How did the railway officials manage the situation?
Railway officials stated that the hilly ghat section became too slippery for the locomotives to pull the trains forward. The loco pilot of the Duronto Express immediately informed the control room. To clear the tracks, relief engines were sent from Gajhandi and Gurpa stations. Train movement on the down line was temporarily stopped and resumed only after the affected trains were moved.
Frequently Asked Questions (FAQs)
Why did the Duronto Express engine fail in Gaya?
The engine failed because heavy rain and strong winds made the tracks in the Gurpa-Gajhandi ghat section extremely slippery, preventing the locomotive from moving forward.
Which rail division handles the affected Gurpa-Dilwa section?
The affected section falls under the Dhanbad Rail Division, and relief engines were dispatched from Gajhandi and Gurpa stations to resolve the issue.



























