The long-awaited Alirajpur-Khandwa railway line project is moving forward. The Final Location Survey (FLS) has been completed, and drone surveys are currently underway. This project aims to connect western and northern railway lines, fulfilling a demand that dates back to 1940.
What is the route and length of the new rail line?
The proposed railway line will be approximately 221 kilometers long. It will pass through several key towns and districts to improve connectivity in the region.
| Proposed Stations/Areas | Key Details |
|---|---|
| Route Path | Kukshi, Singhana, Manawar, Barwani, Anjad, Julwaniya, Khargone, Bhikangaon, Deshgaon, and Khandwa |
| Total Length | Approximately 221 KM |
| Survey Budget | 6.25 Crore Rupees |
| Surveying Authority | Western Railway Vadodara Division |
How will this project benefit the local people?
This rail line will directly connect the Nimar region to Gujarat, reducing the distance between Khandwa and Baroda by about 200 kilometers. It will provide a huge boost to the agriculture industry in Khargone and make travel easier for the tribal population.
The central government approved the final location survey in the August 2024 budget. Currently, drone surveys have been completed up to Kukshi, and the Detailed Project Report (DPR) will be prepared based on the FLS results.
Who are the key people pushing for this project?
The Tapti-Narmada Rail Line Central Committee has been active in submitting memorandums to the PMO. MP Gajendra Patel raised the issue in the Lok Sabha, while MP Gyaneshwar Patil has written to Railway Minister Ashwini Vaishnaw to expedite the approval and improve the survey plan.
Frequently Asked Questions (FAQs)
What is the current status of the Alirajpur-Khandwa rail line?
The Final Location Survey (FLS) is complete and drone surveys are ongoing. The government has approved 6.25 crore rupees for the survey work.
Which cities will be covered by this new railway line?
The line will cover Kukshi, Singhana, Manawar, Barwani, Anjad, Julwaniya, Khargone, Bhikangaon, Deshgaon, and Khandwa.
{“@context”: “https://schema.org”, “@type”: “FAQPage”, “mainEntity”: [{“@type”: “Question”, “name”: “What is the current status of the Alirajpur-Khandwa rail line?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “The Final Location Survey (FLS) is complete and drone surveys are ongoing. The government has approved 6.25 crore rupees for the survey work.”}}, {“@type”: “Question”, “name”: “Which cities will be covered by this new railway line?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “The line will cover Kukshi, Singhana, Manawar, Barwani, Anjad, Julwaniya, Khargone, Bhikangaon, Deshgaon, and Khandwa.”}}]}



























