Northern Railway is planning to build a new exit gate at Anand Vihar Railway Station to tackle the growing problem of traffic jams and passenger crowds. The station currently handles between 1.5 lakh to 2 lakh passengers daily, leading to heavy congestion at the main entrance. This new move aims to make commuting easier for thousands of travelers.
Where will the new exit be and how will it help
The proposed second exit will be constructed next to the Road Over Bridge (ROB) on Chaudhary Charan Singh Marg. This will allow private vehicles, cabs, and ambulances to exit the station directly without disturbing pedestrians. Vehicles can take a U-turn from here to head towards Delhi or Ghaziabad, reducing the pressure on the main gate which is often blocked by temporary shops and encroachments.
What are the key development plans for the station
The railway wants to implement a two-way entry and exit system similar to New Delhi and Hazrat Nizamuddin stations. To achieve this, additional land is required, currently occupied by a school, for which the railway may request the Delhi Government. Furthermore, a permanent holding area is approved for May 2026 to manage crowds better.
| Feature | Details |
|---|---|
| Daily Passenger Load | 1.5 Lakh to 2 Lakh |
| Train Operations | 122 pairs of trains (including Delhi-Howrah) |
| Proposed Exit Location | Chaudhary Charan Singh Marg (near ROB) |
| Integration Plan | Connecting Railway, Metro, and Namo Bharat via FOB |
| Holding Area Deadline | May 2026 |
How will the multi-modal integration work
Following instructions from the PMO, the terminal will be made jam-free by integrating the railway station, metro station, and Namo Bharat (RRTS) station. Passengers will be able to move between these different transport modes using Foot Over Bridges (FOB) without having to step onto the main road, ensuring a seamless and safer travel experience.
Frequently Asked Questions (FAQs)
Where will the new exit be located at Anand Vihar station?
The new exit is proposed to be built on Chaudhary Charan Singh Marg, right next to the Road Over Bridge (ROB).
How will the railway manage the land for the new entrance?
The railway may request land from the Delhi Government where a school is currently located, and in return, the railway may build a new school on its own land.



























