• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Friday, July 31, 2026
HelloRail
  • News
  • Stories

    Dr. Ambedkar Nagar – New Delhi SF Express: Train consistently arrives early at Hazrat Nizamuddin, check details

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

  • Development

    Chhattisgarh gets approval for new 295 km rail line connecting Dongargarh and Katghora

    Lucknow North MLA proposes renaming Mohibullapur railway station to Jankipuram

    Navalur station resumes freight operations with major machinery consignment to Rajasthan

    Indian Railways approves 519 crore infrastructure projects for station and track upgrades

    East Central Railway plans permanent closure of Saharsa gate 31 for yard remodeling

    North Western Railway to undertake track doubling work on Ajmer Chandaria section in late 2026

    Runicha Express diverted for track doubling work and Rani Khet Express gets LHB coach upgrade

    Indian Railways upgrades Ranikhet Express with modern LHB coaches for safer travel

    Indias longest rail grade separator in Katni nears completion to boost train speeds

  • Vande Bharat

    Indian Railways Begins High Speed Trials for New Vande Bharat Freight EMU Prototype

    India First Vande Bharat Freight EMU Achieves 145 kmph During Technical Trials

    Indias First Vande Bharat Freight EMU Hits 145 Kmph During High Speed Trials

    Nainital MP Ajay Bhatt pushes for daily Vande Bharat service between Kathgodam and Delhi

    Indian Railways begins trials for the first Vande Bharat Superfast Parcel Express

    Indian Railways begins trial runs for the first Vande Bharat superfast parcel train in Kota

    Indian Railways Boosts Capacity With New 16 Coach Vande Bharat Trainsets

    Andhra Pradesh gears up for its first Vande Bharat Sleeper train launch by Dussehra

    Indian Railways explains how distributed traction technology powers Vande Bharat performance

No Result
View All Result
HelloRail
  • News
  • Stories

    Dr. Ambedkar Nagar – New Delhi SF Express: Train consistently arrives early at Hazrat Nizamuddin, check details

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

  • Development

    Chhattisgarh gets approval for new 295 km rail line connecting Dongargarh and Katghora

    Lucknow North MLA proposes renaming Mohibullapur railway station to Jankipuram

    Navalur station resumes freight operations with major machinery consignment to Rajasthan

    Indian Railways approves 519 crore infrastructure projects for station and track upgrades

    East Central Railway plans permanent closure of Saharsa gate 31 for yard remodeling

    North Western Railway to undertake track doubling work on Ajmer Chandaria section in late 2026

    Runicha Express diverted for track doubling work and Rani Khet Express gets LHB coach upgrade

    Indian Railways upgrades Ranikhet Express with modern LHB coaches for safer travel

    Indias longest rail grade separator in Katni nears completion to boost train speeds

  • Vande Bharat

    Indian Railways Begins High Speed Trials for New Vande Bharat Freight EMU Prototype

    India First Vande Bharat Freight EMU Achieves 145 kmph During Technical Trials

    Indias First Vande Bharat Freight EMU Hits 145 Kmph During High Speed Trials

    Nainital MP Ajay Bhatt pushes for daily Vande Bharat service between Kathgodam and Delhi

    Indian Railways begins trials for the first Vande Bharat Superfast Parcel Express

    Indian Railways begins trial runs for the first Vande Bharat superfast parcel train in Kota

    Indian Railways Boosts Capacity With New 16 Coach Vande Bharat Trainsets

    Andhra Pradesh gears up for its first Vande Bharat Sleeper train launch by Dussehra

    Indian Railways explains how distributed traction technology powers Vande Bharat performance

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Rain Fury: Mumbai-Delhi Rajdhani delayed by 14 hours, over 40 trains affected in Maharashtra and Gujarat

Kush Singh by Kush Singh
July 8, 2026
in News
0 0
0
Share on FacebookShare on Twitter

Heavy rainfall across Maharashtra and Gujarat has caused severe disruptions to railway services. The Mumbai-Delhi Rajdhani Express is running over 14 hours late, and more than 40 trains have been impacted. Waterlogging and landslides have forced the railways to suspend or reschedule several services to ensure passenger safety.

ADVERTISEMENT

ℹ️: Meerut-Panipat Railway Line: Final survey to begin for 104 km new track।

How are train services affected in Maharashtra and Gujarat?

Western Railway reported that train movement near Sachin station in Surat remained suspended from July 7 evening until July 8 morning due to waterlogging. Local trains between Vasai, Nalasopara, and Virar are running 25-30 minutes late. In Maharashtra, landslides on the Lonavala-Karjat section required the deployment of 200 workers for restoration. The Mumbai-Pune route via Bhor Ghat is still not fully operational as of July 6.

ADVERTISEMENT

What is the current status of cancelled and delayed trains?

The impact on long-distance and suburban services has been significant. The following data summarizes the disruptions up to July 8, 2026:

Service Type Impact Status
Cancelled Trains 39 trains
Short-Terminated Trains 21 trains
Rescheduled Trains 46 trains
Suburban Services (July 7) 200+ cancelled
Mumbai-Delhi Rajdhani 14 hours delay

Official advice for passengers and current alerts

Western Railway and Central Railway have advised passengers to check the latest train status before leaving for stations. The National Train Enquiry System (NTES) and Rail Madad helpline (139) are available for real-time updates. Meanwhile, the IMD has issued Red and Orange alerts for various regions in Maharashtra and Gujarat. Home Minister Amit Shah has reviewed the situation with the Chief Ministers of both states to provide necessary central assistance.

Frequently Asked Questions (FAQs)

How can passengers check their train status during these delays?

Passengers should use the National Train Enquiry System (NTES) or call the Rail Madad helpline at 139 for the most recent updates.

Which specific rail sections are facing the most issues?

Major disruptions are reported on the Mumbai-Ahmedabad corridor, Bhor Ghat section (Mumbai-Pune), Vasai-Virar section, and the Karjat-Lonavala section.

Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat