• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Thursday, July 2, 2026
HelloRail
  • News
  • Stories

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

  • Development

    Railway safety boost: Signaling system to be modernized in Malda Division with ₹274 crore project

    Kangra Valley Toy Train: Narrow gauge services restored in Himachal Pradesh after 4 years

    Indore Railway Station Redevelopment: Shastri Bridge removal and expansion plans delayed until after Simhastha-2028

    Southern Railway: ChicKing outlets to open at 10 railway stations in Kerala

    Railway safety boost: RDSO Lucknow’s Fatigue Testing Laboratory to ensure stronger train parts

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Raipur Railway Division: ₹226 crore project approved for high-tech signaling at 13 stations

    Betia-Mazhaulia rail section doubling: 3 trains cancelled and several routes diverted till July 3

    Railway safety boost: Kavach 4.0 commissioned on Tundla-Panki Dham section for 130 kmph speed

  • Vande Bharat

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Vande Bharat Sleeper: New trainset reaches Bengaluru for Mumbai route trials

    IRCTC Update: Confirmed tickets available up to 15 minutes before train departure

    Vande Bharat Express: Seats can now be booked 15 minutes before departure, check details

    Vande Bharat Express: Departure timings revised for two trains from Varanasi, check new schedule

    Northern Railway Update: Timings changed for 3 passenger trains and 2 Vande Bharat Express

    Vande Bharat Express: Last minute seat booking now available in 17 South India trains

    Vande Bharat Express: Current booking facility now available in 17 trains of Southern Railway

    Vande Bharat Sleeper: Indian Railways to launch trains on 9 new routes including Mumbai-Bengaluru

No Result
View All Result
HelloRail
  • News
  • Stories

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

  • Development

    Railway safety boost: Signaling system to be modernized in Malda Division with ₹274 crore project

    Kangra Valley Toy Train: Narrow gauge services restored in Himachal Pradesh after 4 years

    Indore Railway Station Redevelopment: Shastri Bridge removal and expansion plans delayed until after Simhastha-2028

    Southern Railway: ChicKing outlets to open at 10 railway stations in Kerala

    Railway safety boost: RDSO Lucknow’s Fatigue Testing Laboratory to ensure stronger train parts

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Raipur Railway Division: ₹226 crore project approved for high-tech signaling at 13 stations

    Betia-Mazhaulia rail section doubling: 3 trains cancelled and several routes diverted till July 3

    Railway safety boost: Kavach 4.0 commissioned on Tundla-Panki Dham section for 130 kmph speed

  • Vande Bharat

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Vande Bharat Sleeper: New trainset reaches Bengaluru for Mumbai route trials

    IRCTC Update: Confirmed tickets available up to 15 minutes before train departure

    Vande Bharat Express: Seats can now be booked 15 minutes before departure, check details

    Vande Bharat Express: Departure timings revised for two trains from Varanasi, check new schedule

    Northern Railway Update: Timings changed for 3 passenger trains and 2 Vande Bharat Express

    Vande Bharat Express: Last minute seat booking now available in 17 South India trains

    Vande Bharat Express: Current booking facility now available in 17 trains of Southern Railway

    Vande Bharat Sleeper: Indian Railways to launch trains on 9 new routes including Mumbai-Bengaluru

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Indian Railways to launch new reservation system by August 2026, confirmed tickets available on running trains

Kush Singh by Kush Singh
June 10, 2026
in Development, News
0 0
0
Share on FacebookShare on Twitter

Indian Railways is preparing to replace its 40-year-old reservation system with a modern Passenger Reservation System (PRS). This new system will be rolled out starting August 2026 to make ticket booking faster and more reliable. Railway Minister Ashwini Vaishnaw recently reviewed the project at Rail Bhawan to ensure a smooth transition for passengers.

ADVERTISEMENT

🚨: Shri Ganganagar Railway Station: New washing lines and yard expansion to boost train connectivity।

How will booking on running trains work?

Passengers will be able to book confirmed berths even after the train has started its journey. The Ticket Travelling Examiners (TTEs) will use upgraded Hand Held Terminals (HHT) to receive instant updates. When a passenger books a vacant seat online, the TTE’s device will get an immediate message for online allocation.

ADVERTISEMENT

What are the new features of the upgraded system?

The new system uses modern technology to handle high transaction volumes and reduce server lags during Tatkal bookings. It also introduces an AI-based waitlist prediction tool to help passengers plan better. The accuracy of this prediction has increased from 53% to 94%.

Key highlights of the digital upgrade

Feature Details
Implementation Date Starting August 2026
Old System Age Used since 1986 (40 years)
Digital Shift 88% of bookings are now online
RailOne App 3.5 crore downloads, 9.29 lakh daily bookings
TTE Device Upgraded HHT for real-time updates

Frequently Asked Questions (FAQs)

When will the new reservation system start?

The upgraded Passenger Reservation System (PRS) will be gradually implemented starting from August 2026.

How does the AI waitlist prediction help passengers?

The AI tool predicts the probability of a waitlisted ticket getting confirmed with 94% accuracy, helping passengers plan their travel.

Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat