• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Thursday, July 23, 2026
HelloRail
  • News
  • Stories

    Dr. Ambedkar Nagar – New Delhi SF Express: Train consistently arrives early at Hazrat Nizamuddin, check details

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

  • Development

    Ranchi Rail Division announces train service disruptions on July 24 due to infrastructure work

    Rani Kamalapati Agartala Express gets 22 modern LHB coaches for safer travel

    Shahjahanpur MP Arun Sagar demands urgent completion of pending railway overbridges

    Indore Rajendra Nagar station to add new stabling line for Simhastha 2028

    Indian Railways introduces four new train services to improve connectivity to Vaishno Devi and Srinagar

    Indian Railways strengthens tracks on Chaukaghat Ganeshpur route to prevent flood damage

    Indian Railways introduces body cameras for TTEs to improve transparency and passenger safety

    East Central Railway proposes new Saharsa to Danapur tri-weekly express to reduce overcrowding

    First direct freight train from India arrives at Nepal Biratnagar customs yard

  • Vande Bharat

    Jodhpur prepares to host India first Vande Bharat sleeper maintenance depot

    Bhopal to Lucknow Sleeper Vande Bharat Express to Reduce Travel Time to Eight Hours

    South Eastern Railway proposes new Vande Bharat sleeper trains from Tatanagar

    Indian Railways shifts to internal production as Vande Bharat sleeper train rollout faces delays

    Gorakhpur Prayagraj Vande Bharat Express to be upgraded to 22 coaches for higher capacity

    Clarification on Amritsar Varanasi Vande Bharat Sleeper Train Launch Rumours

    Gorakhpur Workshop Completes First Ever Vande Bharat Rake Overhaul

    Vande Bharat Express: Technical upgrade for 500 coaches to improve safety and travel experience

    Jammu Railway Update: Maurya Dhwaj Express delayed by 5 hours, Vande Bharat updates for passengers

No Result
View All Result
HelloRail
  • News
  • Stories

    Dr. Ambedkar Nagar – New Delhi SF Express: Train consistently arrives early at Hazrat Nizamuddin, check details

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

  • Development

    Ranchi Rail Division announces train service disruptions on July 24 due to infrastructure work

    Rani Kamalapati Agartala Express gets 22 modern LHB coaches for safer travel

    Shahjahanpur MP Arun Sagar demands urgent completion of pending railway overbridges

    Indore Rajendra Nagar station to add new stabling line for Simhastha 2028

    Indian Railways introduces four new train services to improve connectivity to Vaishno Devi and Srinagar

    Indian Railways strengthens tracks on Chaukaghat Ganeshpur route to prevent flood damage

    Indian Railways introduces body cameras for TTEs to improve transparency and passenger safety

    East Central Railway proposes new Saharsa to Danapur tri-weekly express to reduce overcrowding

    First direct freight train from India arrives at Nepal Biratnagar customs yard

  • Vande Bharat

    Jodhpur prepares to host India first Vande Bharat sleeper maintenance depot

    Bhopal to Lucknow Sleeper Vande Bharat Express to Reduce Travel Time to Eight Hours

    South Eastern Railway proposes new Vande Bharat sleeper trains from Tatanagar

    Indian Railways shifts to internal production as Vande Bharat sleeper train rollout faces delays

    Gorakhpur Prayagraj Vande Bharat Express to be upgraded to 22 coaches for higher capacity

    Clarification on Amritsar Varanasi Vande Bharat Sleeper Train Launch Rumours

    Gorakhpur Workshop Completes First Ever Vande Bharat Rake Overhaul

    Vande Bharat Express: Technical upgrade for 500 coaches to improve safety and travel experience

    Jammu Railway Update: Maurya Dhwaj Express delayed by 5 hours, Vande Bharat updates for passengers

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Kanpur-Lucknow Rail Route: Tree fall disrupts trains in Unnao and Ganga Bridge mega block ends

Kush Singh by Kush Singh
May 13, 2026
in Important, News
0 0
0
Share on FacebookShare on Twitter

The Kanpur-Lucknow rail route experienced two major developments on Wednesday, May 13, 2026. A heavy storm in Unnao caused a large tree to fall on the tracks, leading to significant delays for several premium trains. Meanwhile, the long-pending maintenance work on the Ganga rail bridge has finally been completed.

ADVERTISEMENT

How did the tree fall affect train services in Unnao?

Due to strong winds and storms in Uttar Pradesh, a massive tree fell across the railway tracks in Unnao. This incident halted train movements on the Kanpur-Lucknow section for about two hours. Major trains including the Vande Bharat Express, Shatabdi Express, and Sabarmati Express were stranded at various stations during this period.

What are the updates on the Ganga Rail Bridge mega block?

The 42-day mega block on the Kanpur-Lucknow Ganga rail bridge, which started around April 1, 2026, ended on the evening of May 13, 2026. The railway department replaced old sleepers with steel H-beam sleepers to ensure the bridge remains strong for the next 30 to 40 years.

ADVERTISEMENT
Details Information
Block Duration 42 Days
Completion Date 13 May 2026
New Speed Limit 75 kmph from 14 May
Affected Trains 70-80 trains (including MEMU and Vande Bharat)

With the completion of this work, trains will now run at a speed of 75 kmph starting May 14, 2026. This change will reduce delays and make the journey safer for passengers.

Frequently Asked Questions (FAQs)

Which trains were affected by the tree fall in Unnao?

Vande Bharat Express, Shatabdi Express, and Sabarmati Express were among the major trains that remained stranded for about two hours.

What was the purpose of the 42-day mega block on the Ganga Bridge?

The block was for replacing old sleepers with steel H-beam sleepers to strengthen the bridge for the next 30-40 years.

Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat