• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Thursday, July 2, 2026
HelloRail
  • News
  • Stories

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

  • Development

    Banda Railway Station: Mega expansion plan approved with 4,329 crore investment

    Railway safety boost: Signaling system to be modernized in Malda Division with ₹274 crore project

    Kangra Valley Toy Train: Narrow gauge services restored in Himachal Pradesh after 4 years

    Indore Railway Station Redevelopment: Shastri Bridge removal and expansion plans delayed until after Simhastha-2028

    Southern Railway: ChicKing outlets to open at 10 railway stations in Kerala

    Railway safety boost: RDSO Lucknow’s Fatigue Testing Laboratory to ensure stronger train parts

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Raipur Railway Division: ₹226 crore project approved for high-tech signaling at 13 stations

    Betia-Mazhaulia rail section doubling: 3 trains cancelled and several routes diverted till July 3

  • Vande Bharat

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Vande Bharat Sleeper: New trainset reaches Bengaluru for Mumbai route trials

    IRCTC Update: Confirmed tickets available up to 15 minutes before train departure

    Vande Bharat Express: Seats can now be booked 15 minutes before departure, check details

    Vande Bharat Express: Departure timings revised for two trains from Varanasi, check new schedule

    Northern Railway Update: Timings changed for 3 passenger trains and 2 Vande Bharat Express

    Vande Bharat Express: Last minute seat booking now available in 17 South India trains

    Vande Bharat Express: Current booking facility now available in 17 trains of Southern Railway

    Vande Bharat Sleeper: Indian Railways to launch trains on 9 new routes including Mumbai-Bengaluru

No Result
View All Result
HelloRail
  • News
  • Stories

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

  • Development

    Banda Railway Station: Mega expansion plan approved with 4,329 crore investment

    Railway safety boost: Signaling system to be modernized in Malda Division with ₹274 crore project

    Kangra Valley Toy Train: Narrow gauge services restored in Himachal Pradesh after 4 years

    Indore Railway Station Redevelopment: Shastri Bridge removal and expansion plans delayed until after Simhastha-2028

    Southern Railway: ChicKing outlets to open at 10 railway stations in Kerala

    Railway safety boost: RDSO Lucknow’s Fatigue Testing Laboratory to ensure stronger train parts

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Raipur Railway Division: ₹226 crore project approved for high-tech signaling at 13 stations

    Betia-Mazhaulia rail section doubling: 3 trains cancelled and several routes diverted till July 3

  • Vande Bharat

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Vande Bharat Sleeper: New trainset reaches Bengaluru for Mumbai route trials

    IRCTC Update: Confirmed tickets available up to 15 minutes before train departure

    Vande Bharat Express: Seats can now be booked 15 minutes before departure, check details

    Vande Bharat Express: Departure timings revised for two trains from Varanasi, check new schedule

    Northern Railway Update: Timings changed for 3 passenger trains and 2 Vande Bharat Express

    Vande Bharat Express: Last minute seat booking now available in 17 South India trains

    Vande Bharat Express: Current booking facility now available in 17 trains of Southern Railway

    Vande Bharat Sleeper: Indian Railways to launch trains on 9 new routes including Mumbai-Bengaluru

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Secunderabad Railway Station Redevelopment: World-class facilities and skywalk to be ready by 2026

Kush Singh by Kush Singh
June 10, 2026
in Development, News
0 0
0
Share on FacebookShare on Twitter

Secunderabad Railway Station is undergoing a massive transformation under the Amrit Bharat Station Scheme. The project aims to turn the station into a world-class facility similar to an airport by December 2026. South Central Railway is executing the work with an estimated cost of ₹714.73 crore.

ADVERTISEMENT

What are the new facilities at Secunderabad Station?

The station will get a completely modern look with G+3 buildings on both north and south sides. A two-level air concourse will be built, where the first level will serve as a waiting area and the upper level will have food courts and retail shops. To help passengers, 26 lifts and 32 escalators are being installed.

How will connectivity and parking improve?

Passengers can reach Secunderabad East and West Metro stations directly through dedicated skywalks without crossing the road. For vehicle owners, a multi-level parking lot will be available. The capacity and technical details are as follows:

ADVERTISEMENT
Feature Details
Car Parking 1,000+ cars
Two-wheeler Parking 5,000+ vehicles
Solar Power 5,000 kWp plant
Passenger Capacity 1.5 lakh to 2.7 lakh per day
Train Capacity 180 trains per day
Waiting Hall Capacity for 3,000 people

What is the current progress of the project?

As of June 8, 2026, about 64% of the work is complete. Construction is moving fast on the south-side basement, arrival areas, and the multi-level parking complex. Union Minister G. Kishan Reddy and Minister of State for Railways Rao Niteesh Singh have reviewed the progress. The final facility is expected to be inaugurated by Prime Minister Narendra Modi.

Frequently Asked Questions (FAQs)

सिकंदराबाद स्टेशन का काम कब तक पूरा होगा?

इस प्रोजेक्ट के दिसंबर 2026 तक पूरा होने की उम्मीद है और जून 2026 तक 64% काम पूरा हो चुका है।

यात्रियों के लिए पार्किंग की क्या सुविधा होगी?

स्टेशन पर मल्टी-लेवल पार्किंग होगी जिसमें 1,000 से ज्यादा कारों और 5,000 से ज्यादा दोपहिया वाहनों की जगह होगी।

Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat