• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Thursday, July 2, 2026
HelloRail
  • News
  • Stories

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

  • Development

    Railway safety boost: Kavach 4.0 commissioned on Tundla-Panki Dham section for 130 kmph speed

    Banda Railway Station: Mega expansion plan approved with 4,329 crore investment

    Railway safety boost: Signaling system to be modernized in Malda Division with ₹274 crore project

    Kangra Valley Toy Train: Narrow gauge services restored in Himachal Pradesh after 4 years

    Indore Railway Station Redevelopment: Shastri Bridge removal and expansion plans delayed until after Simhastha-2028

    Southern Railway: ChicKing outlets to open at 10 railway stations in Kerala

    Railway safety boost: RDSO Lucknow’s Fatigue Testing Laboratory to ensure stronger train parts

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Raipur Railway Division: ₹226 crore project approved for high-tech signaling at 13 stations

  • Vande Bharat

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Vande Bharat Sleeper: New trainset reaches Bengaluru for Mumbai route trials

    IRCTC Update: Confirmed tickets available up to 15 minutes before train departure

    Vande Bharat Express: Seats can now be booked 15 minutes before departure, check details

    Vande Bharat Express: Departure timings revised for two trains from Varanasi, check new schedule

    Northern Railway Update: Timings changed for 3 passenger trains and 2 Vande Bharat Express

    Vande Bharat Express: Last minute seat booking now available in 17 South India trains

    Vande Bharat Express: Current booking facility now available in 17 trains of Southern Railway

    Vande Bharat Sleeper: Indian Railways to launch trains on 9 new routes including Mumbai-Bengaluru

No Result
View All Result
HelloRail
  • News
  • Stories

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

    Hussainiwala Railway Station: The unique Indian station where trains arrive only twice a year

  • Development

    Railway safety boost: Kavach 4.0 commissioned on Tundla-Panki Dham section for 130 kmph speed

    Banda Railway Station: Mega expansion plan approved with 4,329 crore investment

    Railway safety boost: Signaling system to be modernized in Malda Division with ₹274 crore project

    Kangra Valley Toy Train: Narrow gauge services restored in Himachal Pradesh after 4 years

    Indore Railway Station Redevelopment: Shastri Bridge removal and expansion plans delayed until after Simhastha-2028

    Southern Railway: ChicKing outlets to open at 10 railway stations in Kerala

    Railway safety boost: RDSO Lucknow’s Fatigue Testing Laboratory to ensure stronger train parts

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Raipur Railway Division: ₹226 crore project approved for high-tech signaling at 13 stations

  • Vande Bharat

    Vande Bharat Sleeper: Kinet Railway Solutions to launch first prototype by December 2026

    Vande Bharat Sleeper: New trainset reaches Bengaluru for Mumbai route trials

    IRCTC Update: Confirmed tickets available up to 15 minutes before train departure

    Vande Bharat Express: Seats can now be booked 15 minutes before departure, check details

    Vande Bharat Express: Departure timings revised for two trains from Varanasi, check new schedule

    Northern Railway Update: Timings changed for 3 passenger trains and 2 Vande Bharat Express

    Vande Bharat Express: Last minute seat booking now available in 17 South India trains

    Vande Bharat Express: Current booking facility now available in 17 trains of Southern Railway

    Vande Bharat Sleeper: Indian Railways to launch trains on 9 new routes including Mumbai-Bengaluru

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Railway Expansion: Centre approves 916 crore project for second line on Thakurganj-Siliguri section

Kush Singh by Kush Singh
June 10, 2026
in Development, News
0 0
0
Share on FacebookShare on Twitter

The Ministry of Railways has given the green light to a major project to lay a second railway line on the Thakurganj-Siliguri section. This 56.41 km long project under the Northeast Frontier Railway (NFR) aims to improve connectivity and reduce congestion. The official approval was issued on June 9, 2026, to enhance the overall network capacity of the region.

ADVERTISEMENT

What is the budget and cost breakdown of the project?

The central government has allocated a total of 916.18 crore rupees for this doubling project. The funds are divided into specific categories to ensure systematic development of the track and power infrastructure.

Expense Head Amount (in Crores)
Civil Works 671.55
Other Miscellaneous Items 149.69
Electricity, TRD and Generator works 94.94

How will this second line benefit passengers and trade?

Railway officials stated that the additional line will increase the network capacity and make train operations smoother. It will reduce operational bottlenecks, allowing both passenger and goods trains to move faster and more safely. Experts believe this is strategically important for strengthening rail links to the Northeast states.

ADVERTISEMENT

Who are the key authorities involved in the execution?

The project is being handled by the Ministry of Railways and the Railway Board. Deepak Singh, Director (Gati Shakti) of the Railway Board, issued the approval letter to the Northeast Frontier Railway (NFR) headquarters in Maligaon. The project is approved under the Umbrella Work 2025-26 and construction will start once formalities are completed.

Frequently Asked Questions (FAQs)

ठाकुरगंज-सिलीगुड़ी रेलखंड की लंबाई कितनी है?

इस रेलखंड की कुल लंबाई 56.41 किलोमीटर है, जिस पर अब दूसरी लाइन बिछाई जाएगी।

इस प्रोजेक्ट पर कुल कितना खर्च होगा?

केंद्र सरकार ने इस परियोजना के लिए कुल 916.18 करोड़ रुपये की राशि स्वीकृत की है।

Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat