• About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy
Friday, July 24, 2026
HelloRail
  • News
  • Stories

    Dr. Ambedkar Nagar – New Delhi SF Express: Train consistently arrives early at Hazrat Nizamuddin, check details

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

  • Development

    Lucknow Manaknagar Railway Station Redevelopment Slated for Completion by April 2027

    Mizoram Bridge 144 stands taller than Qutub Minar as a new milestone for Indian Railways

    Ranchi Rail Division announces train service disruptions on July 24 due to infrastructure work

    Rani Kamalapati Agartala Express gets 22 modern LHB coaches for safer travel

    Shahjahanpur MP Arun Sagar demands urgent completion of pending railway overbridges

    Indore Rajendra Nagar station to add new stabling line for Simhastha 2028

    Indian Railways introduces four new train services to improve connectivity to Vaishno Devi and Srinagar

    Indian Railways strengthens tracks on Chaukaghat Ganeshpur route to prevent flood damage

    Indian Railways introduces body cameras for TTEs to improve transparency and passenger safety

  • Vande Bharat

    Jodhpur prepares to host India first Vande Bharat sleeper maintenance depot

    Bhopal to Lucknow Sleeper Vande Bharat Express to Reduce Travel Time to Eight Hours

    South Eastern Railway proposes new Vande Bharat sleeper trains from Tatanagar

    Indian Railways shifts to internal production as Vande Bharat sleeper train rollout faces delays

    Gorakhpur Prayagraj Vande Bharat Express to be upgraded to 22 coaches for higher capacity

    Clarification on Amritsar Varanasi Vande Bharat Sleeper Train Launch Rumours

    Gorakhpur Workshop Completes First Ever Vande Bharat Rake Overhaul

    Vande Bharat Express: Technical upgrade for 500 coaches to improve safety and travel experience

    Jammu Railway Update: Maurya Dhwaj Express delayed by 5 hours, Vande Bharat updates for passengers

No Result
View All Result
HelloRail
  • News
  • Stories

    Dr. Ambedkar Nagar – New Delhi SF Express: Train consistently arrives early at Hazrat Nizamuddin, check details

    Patalpani-Kalakund Heritage Train: Scenic toy train services resume in Madhya Pradesh, check fares

    Husainiwala Railway Station: Only two trains run here in a year, check the reason

    India’s Shortest Train Journey: Nagpur to Ajni route completes trip in just 9 minutes

    Railway theft prevention: Why you cannot use train fans at home

    Indian Railways Fined: Confirmed AC coach missing, elderly passengers forced into general compartment

    Howrah Junction: Unique railway station where cars drive on platforms next to trains, check details

    Indian Railways Update: What do red, blue, and yellow engine colors signify? Check details

    Northern Railway Surgeon Dr. Vishwanath Tiwari Wins 4th Ironman Title and Sets Guinness World Record

  • Development

    Lucknow Manaknagar Railway Station Redevelopment Slated for Completion by April 2027

    Mizoram Bridge 144 stands taller than Qutub Minar as a new milestone for Indian Railways

    Ranchi Rail Division announces train service disruptions on July 24 due to infrastructure work

    Rani Kamalapati Agartala Express gets 22 modern LHB coaches for safer travel

    Shahjahanpur MP Arun Sagar demands urgent completion of pending railway overbridges

    Indore Rajendra Nagar station to add new stabling line for Simhastha 2028

    Indian Railways introduces four new train services to improve connectivity to Vaishno Devi and Srinagar

    Indian Railways strengthens tracks on Chaukaghat Ganeshpur route to prevent flood damage

    Indian Railways introduces body cameras for TTEs to improve transparency and passenger safety

  • Vande Bharat

    Jodhpur prepares to host India first Vande Bharat sleeper maintenance depot

    Bhopal to Lucknow Sleeper Vande Bharat Express to Reduce Travel Time to Eight Hours

    South Eastern Railway proposes new Vande Bharat sleeper trains from Tatanagar

    Indian Railways shifts to internal production as Vande Bharat sleeper train rollout faces delays

    Gorakhpur Prayagraj Vande Bharat Express to be upgraded to 22 coaches for higher capacity

    Clarification on Amritsar Varanasi Vande Bharat Sleeper Train Launch Rumours

    Gorakhpur Workshop Completes First Ever Vande Bharat Rake Overhaul

    Vande Bharat Express: Technical upgrade for 500 coaches to improve safety and travel experience

    Jammu Railway Update: Maurya Dhwaj Express delayed by 5 hours, Vande Bharat updates for passengers

No Result
View All Result
HelloRail
No Result
View All Result
ADVERTISEMENT

Prayagraj Division: High-mast lights to be installed at railway stations for passenger safety

Kush Singh by Kush Singh
May 13, 2026
in Development, News
0 0
0
Share on FacebookShare on Twitter

North Central Railway has announced a plan to install high-mast lights at various railway stations under the Prayagraj Division. The project aims to remove darkness from station premises and improve overall security for passengers. A budget of 3.13 crore rupees has been approved for this development work.

ADVERTISEMENT

ℹ️: Mumbai Local Train: Western Railway to conduct night ticket checking with special Batman Team।

What is the goal of this lighting project?

The main objective is to increase the safety and convenience of passengers, especially during night hours. High-mast lights provide much more illumination than regular lights, covering a larger area of the station. This will help in controlling the activities of antisocial elements and make it easier for women and elderly passengers to move around comfortably.

ADVERTISEMENT

Which areas will be covered and when will it be completed?

The project will cover all major stations of the Prayagraj Division, including Prayagraj Junction. Special focus will be given to circulating areas and outer sections where lighting is currently insufficient. The railway administration has already issued e-tenders for the work, and the project is expected to be completed within six months.

Detail Information
Project Name Installation of High-Mast Lights
Total Budget 3.13 Crore Rupees
Target Timeline 6 Months
Key Focus Area Circulating Areas and Major Stations
Executing Authority North Central Railway (Prayagraj Division)

Frequently Asked Questions (FAQs)

प्रयागराज मंडल में हाई-मास्ट लाइटें लगाने में कितना खर्च आएगा?

इस परियोजना के लिए उत्तर मध्य रेलवे ने 3.13 करोड़ रुपये का बजट स्वीकृत किया है।

यह काम कितने समय में पूरा होगा?

रेल प्रशासन ने इस पूरी परियोजना को छह महीने के भीतर पूरा करने का लक्ष्य रखा है।

Kush Singh

Kush Singh

Author has been working in digital media sector for last 8 Years. He has served popular websites like GulfHindi, DelhiBreakings and Network18. Author is now writing best on India's Largest Public Transport Interest "Railway" as Lead Role. For any Suggestions about Author Write up Share on Kush@hellorail.in

Hello Rail

We are Indian Railway informer. Aim is to Provide Most Accurate, Updated Information about Life Line of India.

Happy Reading.
Founder: Lov Singh




Gulfhindi.com

Important Links

  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Contact Us.

  • Email: poo@hellorail.in
  • Phone: 9470830308 (WhatsApp)
  • Address: Samvardhini Society B Block, 509 Ramjaipal Road, Patna, 801503, Bihar, India
  • About
  • Advertise
  • Career
  • Contact
  • Editorial Policy
  • Fact Checking Policy
  • Privacy Policy

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • News
  • Stories
  • Development
  • Vande Bharat